BLD-Final | 3/25/2019 | 4/2/2019 | 4/2/2019 | P | PASS |
Tony Young
|
|
|
We need a final on the deck project we built. The landscaping is not finished yet but that is a different contractor. Hence the steps from the east side are not complete because they are part of the landscape. Please call me with any questions. The plans and engineering sign off for the handrail are in the tackle box marked "plans". thanks Phone #: ###-#### Inspection requested via web by Michael Kuhn
|
DOC - Permit Finaled | 4/2/2019 | 4/2/2019 | 4/2/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 3/23/2019 | 3/25/2019 | 3/25/2019 | A | PART |
Tony Young
|
|
|
We need a final on the deck project we built. The landscaping is not finished yet but that is a different contractor. Hence the steps from the east side are not complete because they are part of the landscape. Please call me with any questions. The plans and engineering sign off for the handrail are in the tackle box marked "plans". thanks Phone #: ###-#### Inspection requested via web by Michael Kuhn,, need to close off future step area on the north/east corner,, then ok
|
BLD-Framing/Rough-in | 1/28/2019 | 1/29/2019 | 1/29/2019 | A | PASS |
Brandon Shaw
|
|
|
needing an engineering connection inspection. Phone #: ###-#### Inspection requested via web by Michael Kuhn
|
BLD-Footing | 12/3/2018 | 12/5/2018 | 12/5/2018 | P | CANC |
Tony Young
|
|
|
Give me a call if you have any questions. Thanks Michael Phone #: ###-#### Inspection requested via web by Michael Kuhn
|