Information based on query as of Tuesday, May 14, 2024.
Permit Information
Permit NumberBLD18-03103
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 5968 E BARBER DR
Project NameCottonwood HN 99-1
Customer Number 
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** **WUI FOOTHILLS ZONE 'A' REQUIREMENTS** Permit for the construction of a new 3191 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 323 sq. ft. of covered patio/porch and a 824 sq. ft. attached garage per the approved plans and any notations. Sp-01 zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions. JJN

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/25/20192/25/20192/25/2019PPASS
DetailsBrandon Shaw
Les Phone #: ###-####
DOC - Permit Finaled2/25/20192/25/20192/25/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results2/25/20192/25/20192/25/2019PDONE
DetailsBrandon Shaw
ACH50- 2.34
BLD-Energy code compliance11/30/201811/30/201811/30/2018PPASS
DetailsBrandon Shaw
OK to cover
BLD-Framing/Rough-in11/30/201811/30/201811/30/2018PCANC
DetailsBrandon Shaw
Corrections SAT...
BLD-Energy code compliance11/27/201811/28/201811/28/2018ACANC
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Framing/Rough-in11/27/201811/28/201811/28/2018APASS
DetailsBrandon Shaw
As per plans, (2) 9 1/2 LVL header needed at master closet...
OK to insulate
BLD-Other11/21/201811/23/201811/23/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Wall Bracing10/29/201810/30/201810/30/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Foundation10/4/201810/4/201810/4/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Foundation10/3/201810/3/201810/3/2018ANR
DetailsBrandon Shaw
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing10/3/201810/3/201810/3/2018ACANC
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing10/2/201810/2/201810/2/2018APASS
DetailsJim Storey
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing10/1/201810/1/201810/1/2018PNR
DetailsBrandon Shaw
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell