BLD-Final | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Tell Riley
|
|
|
PAT Phone #: ###-####//trades finals complete//signatures required complete//final complete//archtect approved alternate on type a unit//
|
BLD-Final | 10/14/2019 | 10/15/2019 | 10/15/2019 | P | CANC |
Tell Riley
|
|
|
Pat Phone #: ###-####
|
BLD-Final | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | PART |
Tell Riley
|
|
|
Matt Phone #: ###-####//final 12 units walk through//still need plan review approval of architects change to type A unit///
ok for temp c of o once we get changes architure
|
FIRE-Final Inspection | 8/19/2019 | 8/21/2019 | 8/21/2019 | A | PASS |
Troy Cobbley
|
|
|
life safety passed.
Matt Phone #: ###-####
|
FIRE-Hydro test above ground | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | FAIL |
Troy Cobbley
|
|
|
One pendant sprinkler head needs adjusted in the second floor, west side, south end apartment.
|
BLD-Final | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | CANC |
Tell Riley
|
|
|
Matt Phone #: ###-####//cancel per Matt//
|
BLD-Final | 8/15/2019 | 8/16/2019 | 8/16/2019 | A | PART |
Tell Riley
|
|
|
Matt Phone #: ###-####//105,106,205,206,305,306//ok for temp occupancy//get plan review approval on letter of type A unit from architect//
|
BLD-Final | 8/5/2019 | 8/5/2019 | 8/5/2019 | P | PART |
Tell Riley
|
|
|
Matt Phone #: ###-####//first six units temp occupancy ok//
|
FIRE-Final Inspection | 8/2/2019 | 8/5/2019 | 8/5/2019 | A | PART |
Troy Cobbley
|
|
|
The second group (six) of apartments to the north of the central breeze way life safety is passed. Matt Phone #: ###-####
|
BLD-Final | 7/26/2019 | 7/29/2019 | 7/29/2019 | A | NR |
Tell Riley
|
|
|
Matt Phone #: ###-####//need final plumbing on units 107,108,207,208,307,308//
|
BLD-Final | 7/22/2019 | 7/23/2019 | 7/23/2019 | A | FAIL |
Tell Riley
|
|
|
Bill Phone #: ###-####//7's and 8's// see list onsite for corrections//
|
FIRE-Final Inspection | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | PART |
Troy Cobbley
|
|
|
Life safety is passed for the six north nmost apartments. Bill Phone #: ###-####
|
BLD-Energy code compliance | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 6/5/2019 | 6/5/2019 | 6/5/2019 | P | NR |
Mike Jordan
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | PART |
Tony Young
|
|
|
Bill Phone #: ###-####,, ok to insulate only. check truss bracing and fire penetrations at energy.
|
BLD-Energy code compliance | 5/24/2019 | 5/24/2019 | 5/24/2019 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 5/23/2019 | 5/23/2019 | 5/23/2019 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Energy code compliance | 5/10/2019 | 5/10/2019 | 5/10/2019 | P | PART |
Jim Sly
|
|
|
Bill Phone #: ###-#### OK for 6 units listed on prior inspection
|
BLD-Framing/Rough-in | 5/9/2019 | 5/9/2019 | 5/9/2019 | P | PASS |
Jim Sly
|
|
|
Bill-6 units-105,205,305,106,206,306 Phone #: ###-####
|
BLD-Energy code compliance | 4/26/2019 | 4/26/2019 | 4/26/2019 | P | PART |
Dave Hannah
|
|
|
Bill Phone #: ###-#### first six units
|
BLD-Framing/Rough-in | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Jim Sly
|
|
|
Bill- inspection for units 107, 108, 207, 208, 308 Phone #: ###-####
|
BLD-Wall Bracing | 4/11/2019 | 4/12/2019 | 4/15/2019 | A | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Conference | 3/26/2019 | 3/27/2019 | 3/27/2019 | A | CANC |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Foundation | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
BLD-Foundation | 1/30/2019 | 1/31/2019 | 2/1/2019 | P | PART |
Tony Young
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 1/29/2019 | 1/30/2019 | 1/30/2019 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | PART |
Brandon Shaw
|
|
|
BLDG A... Work in progress...
|