Information based on query as of Friday, April 19, 2024.
Permit Information
Permit NumberBLD18-03200
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 12555 W FRANKLIN RD
Project NameFranklin Commerce Ctr - Bldg 1
Customer Number 
ePlanReviewYes
Description
(FRANKLIN COMMERCE CENTER – BUILDING #1 (A) - SHELL) (DRH18-00102) (DRH18-00249) The fire sprinkler system is used for building area increase and for fire area. To construct a new one story, 34,754 square foot shell building (34,973 square feet projected roof area). This is a shell only permit. This permit is not intended to establish a Certificate of Occupancy for any tenant. Future occupancies could include B, M, S-1, and F-1. Future tenants are required to apply for their own permit to establish occupancy. Work is to include concrete continuous footings, concrete tilt-up exterior wall panels, interior concrete spot footings, steel columns with steel base plates and anchors, concrete slab on grade, steel open-web roof girders, steel open-web roof joists, steel roof decking, rigid insulation installed on top or the roof deck with a single ply membrane roof covering, primary and secondary roof drains, skylights with fall proof cages, roll-up exterior doors, exterior man doors, exterior storefront windows and doors, exterior steel stairways with steel landings, two trash enclosures constructed of concrete tilt-up panel with steel gates, a 50 foot wide concrete apron at the loading dock area, a 1-hr fire riser room with a door directly to the outside, and steel shade awnings at storefront windows and doors. Minimal heating and lighting will be provided. Special Inspection is required for soils, concrete, steel (including welding), and for post-installed anchors in hardened concrete. Deferred submittals include the design for open web steel girders and open web steel roof joists. Concrete retaining walls will also be constructed on site. Future roof top HVAC units weighing 750 pounds each were anticipated and roof curbs were provided. The gas unit heaters weigh 172 pounds each. Separate racking permit are required for racks over 8 feet tall. All work shall be done without impacting the integrity of the existing canal and in accordance with canal company recommendations. The structural integrity of the canal is required to be maintained. A safe dispersal area is required on the South side of this building at least 50 feet from the building. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. Service sinks, toilet rooms, and perhaps drinking fountains for each tenant space will be required under future tenant improvement permits. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/15/201910/15/201910/15/2019PPASS
DetailsMike Jordan
TONY Phone #: ###-####
DOC - Permit Finaled10/15/201910/15/201910/15/2019PPASS
DetailsMike Jordan
Received special inspection final letter. Ok for final.
BLD-Final10/11/201910/14/201910/14/2019ANR
DetailsMike Jordan
tONY Phone #: ###-####. Needs public works final.
BLD-Final9/26/20199/27/20199/27/2019APASS
DetailsTell Riley
Tony Phone #: ###-####//final complete per plans//pending all special inspections are complete and final//
FIRE-Final Inspection9/25/20199/26/20199/26/2019APASS
DetailsTroy Cobbley
Life safety passed. Tony Phone #: ###-####
FIRE-Final Inspection9/19/20199/19/20199/19/2019PFAIL
DetailsTroy Cobbley
Provide final inspections for the project related fire alarm permits and fire sprinkler permits. Need fire dept access signage as discussed. Tony Phone #: ###-####
BLD-Framing/Rough-in7/29/20197/29/20197/29/2019PPASS
DetailsMike Jordan
Tony Phone #: ###-####. Interior steel stud framed walls for riser and electrical rooms.
BLD-Framing/Rough-in7/24/20197/25/20197/25/2019ANR
DetailsTell Riley
Anthony Phone #: ###-####//electrical room and fire riser room framing//not ready need fire inspection and electrical inspection prior to framing ///
BLD-Concrete3/28/20193/29/20193/29/2019APEND
DetailsDave Hannah
concrete panels- Gene Phone #: ###-#### ok after spec inspection sign offs
BLD-Foundation3/12/20193/12/20193/12/2019PPASS
DetailsMike Jordan
inpection for slab on grade-Jean Phone #: ###-####
BLD-Concrete2/28/20193/1/20193/1/2019APART
DetailsMike Jordan
rebar- Gene Phone #: ###-####. Remaining exterior east footing. Work in progress, ok to place concrete pending special inspection.
BLD-Foundation2/21/20192/22/20192/22/2019ADEFR
DetailsMike Jordan
rebar-Gene Phone #: ###-####
BLD-Foundation2/19/20192/19/20192/19/2019PPART
DetailsMike Jordan
Rebar // Jean Phone #: ###-####
BLD-Conference2/11/20192/12/20192/12/2019ADONE
DetailsMike Jordan
Gene Phone #: ###-####
BLD-Concrete2/8/20192/11/20192/11/2019APART
DetailsMike Jordan
rebar- gene Phone #: ###-####