Permit Information
Permit NumberBLD18-03335
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 5549 E HOOTOWL DR
Project NameHighland HN 41-1
Customer Number 
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** **HILLSIDE** **WUI FOOTHILLS ZONE 'A' REQUIREMENTS** Permit for the construction of a new 3388 sq. ft., two story (first story 1894 sq. ft., second story 1494 sq. ft.) single family dwelling with 3 bedrooms, 3.5 bathrooms, approximately 604 sq. ft. of covered patio/porch and a 993 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions. JJN

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/27/20193/27/20193/27/2019PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled3/27/20193/27/20193/27/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results3/27/20193/27/20193/27/2019PDONE
DetailsBrandon Shaw
ACH50- 3.87
BLD-Final3/21/20193/21/20193/21/2019PNR
DetailsBrandon Shaw
Need PLM and ELE finals...
BLD-Other1/24/20191/24/20191/24/2019PPASS
DetailsBrandon Shaw
Work in progress
BLD-Energy code compliance1/24/20191/24/20191/24/2019PPEND
DetailsBrandon Shaw
Pending under floor and plumbing insulation...
BLD-Framing/Rough-in1/22/20191/23/20191/23/2019APEND
DetailsBrandon Shaw
Remove dryer duct from garage seperation wall, as per discussion...
OK to insulate...
BLD-Framing/Rough-in1/18/20191/22/20191/22/2019ADEFR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kyle Seick// washer and dryer in the garage// membrane wall protection not clear as to how planreviewer meets code.
BLD-Wall Bracing12/20/201812/20/201812/20/2018APART
DetailsBrandon Shaw
First floor only...
Work in progress...
BLD-Footing11/27/201811/28/201811/28/2018ACANC
DetailsBrandon Shaw
Already poured
BLD-Foundation11/8/201811/8/201811/8/2018APASS
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing11/5/201811/6/201811/6/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Footing11/5/201811/6/201811/5/2018ACANC
DetailsBrandon Shaw
Inspection cancelled via mobile web on Monday, November 05, 2018.
BLD-Footing11/5/201811/5/201811/5/2018PNR
DetailsDave Hannah
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell still working on spredding boards and no geo tect sign off