BLD-Final | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Dave Hannah
|
|
|
Erik Phone #: ###-####
|
FIRE-Final Inspection | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Jim Page
|
|
|
No fire sprinkler modifications, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
Erik Phone #: ###-####
|
BLD-Framing/Rough-in | 12/19/2019 | 12/20/2019 | 12/20/2019 | A | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|
FIRE-Final Inspection | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | CANC |
Jim Page
|
|
|
Reference noted entered by Troy on 21OCT2019 for life fire safety, this request is cancelled.
Eric Phone #: ###-####
|
BLD-Final | 10/21/2019 | 10/21/2019 | 10/21/2019 | P | PART |
Brandon Shaw
|
|
|
Temp C. of O. is OK'd for coffee bar area only...
|
FIRE-Final Inspection | 10/21/2019 | 10/21/2019 | 10/21/2019 | P | PART |
Troy Cobbley
|
|
|
A temporary for life safety has been approved per Joe Bruce. Still need the project related fire alarm permit issued/finaled prior to a final life safety inspection.
Eric Phone #: ###-####
|
BLD-Conference | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | DONE |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|
FIRE-Conference | 9/19/2019 | 9/19/2019 | 9/19/2019 | A | DONE |
Jim Page
|
|
|
Fire conference is complete, a fire alarm contractor will need to be contacted, fire alarm notification is required for area of work, currently no notification is in place in lobby remodel.
|
FIRE-Final Inspection | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | CANC |
Jim Page
|
|
|
Request was for a conference, this request is cancelled.
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 6/12/2019 | 6/12/2019 | 6/12/2019 | P | PART |
Tony Young
|
|
|
Eric Phone #: ###-####,, plaza west area ok for seating planter framing ok
|
FIRE-Final Inspection | 5/29/2019 | 5/30/2019 | 5/30/2019 | A | CANC |
Jim Page
|
|
|
Wrong pemrit called in for fire life safety, this request is cancelled per conversation with point of contact.
Erik Phone #: ###-####
|
BLD-Framing/Rough-in | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | PART |
Brandon Shaw
|
|
|
Southwest corner in ground planter, rebar... Southeast corner planter boxes, framing...
|
BLD-Framing/Rough-in | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | PART |
Tony Young
|
|
|
Eirc Phone #: ###-####,, bench frame on the north/east corner
|
BLD-Framing/Rough-in | 3/15/2019 | 3/15/2019 | 3/18/2019 | P | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|
BLD-Foundation | 2/11/2019 | 2/12/2019 | 2/12/2019 | A | PART |
Tony Young
|
|
|
Eric Phone #: ###-####,, s/e planter slab area
|
BLD-Foundation | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PART |
Brandon Shaw
|
|
|
Work in progress... Planter A...
|
BLD-Other | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-#### fire prof floor pens.
|
BLD-Conference | 1/9/2019 | 1/9/2019 | 1/10/2019 | P | PEND |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|