Information based on query as of Wednesday, April 24, 2024.
Permit Information
Permit NumberBLD18-03423
StatusFinaled
Name DAUBY CONSTRUCTION MGMT
Site Address 1111 W JEFFERSON ST
Project NameBoise Plaza Lobby Remodel
Customer Number 
ePlanReviewYes
Description
(BOISE PLAZA LOBBY REMODEL – 1ST STORY) (2-11-18 PLAN MODIFICATION TO CONSTRUCT A CONCIERGE DESK, A COFFEE BAR WITH PENDANT LIGHT, FOUR (4) 24 SQUARE FOOT MEETING PODS WITH OPEN WOOD LATTICE CEILINGS AND WALLS CONSTRUCTED OF CONCEALED FIRE-RETARDANT-TREATED WOOD AND ATTACHED TO THE FLOOR WITH POST-INSTALLED ANCHORS IN HARDENED CONCRETE, AND FOUR (4) INTERIOR DECORATIVE CANOPIES WITH STEEL COLUMNS, BEAMS, AND HANGING DECORATIVE SHAPES. SPECIAL INSPECTION IS REQUIRED FOR WELDING AND FOR POST-INSTALLED ANCHORS IN HARDENED CONCRETE.) The fire sprinkler system is used for high-rise and for the atrium. To remodel the 11,271 square foot 1st story lobby having 4 elevators that give access to other stories. The existing triangular-shaped planters (including trees, other plants, and dirt) will be removed. Portions of the existing upturned concrete beams at the edges of the former planters will be removed to allow for the new configuration. After the remodel, the new floor area of the atrium, not including planters and elevators, will be about 9,510 square feet. Work is to include new concrete slabs over structural foam at former recessed planters; a new raised planter with a waterproofing membrane and adjacent bench seats; new planters flush with the floor having concrete retaining walls with waterproofing membranes, drains, and overflow drains; soil, trees, shrubs, and other plants in new planters; new wood and tile floor finishes; decorative tree-like canopies; wood bench seats with tile finishes at existing upturned concrete beams; galvanized planter pans above existing upturned concrete beams with adjacent wood bench seats; a coffee bar; meeting pods; a reception desk; and interior finishes. Special Inspection is required for concrete, for steel (including welding), and for post-installed anchors in hardened concrete. Deferred submittals include posts and attachments for new interior decorative tree-like canopies, a coffee bar, meeting pods, and a reception desk. The work is required to comply with the approved drawings, with the structural evaluation, with the plan review report, and with all applicable codes and ordinances. The atrium smoke control system is required to be maintained functional as originally approved. Access to at least 2 exits is required to be maintained from the 1st story lobby for the duration of this construction project. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/31/20201/31/20201/31/2020PPASS
DetailsDave Hannah
Erik Phone #: ###-####
FIRE-Final Inspection1/31/20201/31/20201/31/2020PPASS
DetailsJim Page
No fire sprinkler modifications, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

Erik Phone #: ###-####
BLD-Framing/Rough-in12/19/201912/20/201912/20/2019APASS
DetailsDave Hannah
Eric Phone #: ###-####
FIRE-Final Inspection10/21/201910/22/201910/22/2019ACANC
DetailsJim Page
Reference noted entered by Troy on 21OCT2019 for life fire safety, this request is cancelled.

Eric Phone #: ###-####
BLD-Final10/21/201910/21/201910/21/2019PPART
DetailsBrandon Shaw
Temp C. of O. is OK'd for coffee bar area only...
FIRE-Final Inspection10/21/201910/21/201910/21/2019PPART
DetailsTroy Cobbley
A temporary for life safety has been approved per Joe Bruce. Still need the project related fire alarm permit issued/finaled prior to a final life safety inspection.

Eric Phone #: ###-####
BLD-Conference9/18/20199/19/20199/19/2019ADONE
DetailsDave Hannah
Eric Phone #: ###-####
FIRE-Conference9/19/20199/19/20199/19/2019ADONE
DetailsJim Page
Fire conference is complete, a fire alarm contractor will need to be contacted, fire alarm notification is required for area of work, currently no notification is in place in lobby remodel.
FIRE-Final Inspection9/18/20199/19/20199/19/2019ACANC
DetailsJim Page
Request was for a conference, this request is cancelled.

Eric Phone #: ###-####
BLD-Framing/Rough-in6/12/20196/12/20196/12/2019PPART
DetailsTony Young
Eric Phone #: ###-####,, plaza west area ok for seating planter framing ok
FIRE-Final Inspection5/29/20195/30/20195/30/2019ACANC
DetailsJim Page
Wrong pemrit called in for fire life safety, this request is cancelled per conversation with point of contact.

Erik Phone #: ###-####
BLD-Framing/Rough-in4/12/20194/12/20194/12/2019PPART
DetailsBrandon Shaw
Southwest corner in ground planter, rebar...
Southeast corner planter boxes, framing...
BLD-Framing/Rough-in3/25/20193/25/20193/25/2019PPART
DetailsTony Young
Eirc Phone #: ###-####,, bench frame on the north/east corner
BLD-Framing/Rough-in3/15/20193/15/20193/18/2019PPASS
DetailsDave Hannah
Eric Phone #: ###-####
BLD-Foundation2/11/20192/12/20192/12/2019APART
DetailsTony Young
Eric Phone #: ###-####,, s/e planter slab area
BLD-Foundation2/4/20192/4/20192/4/2019PPART
DetailsBrandon Shaw
Work in progress...
Planter A...
BLD-Other1/22/20191/22/20191/22/2019PPASS
DetailsDave Hannah
Eric Phone #: ###-#### fire prof floor pens.
BLD-Conference1/9/20191/9/20191/10/2019PPEND
DetailsDave Hannah
Eric Phone #: ###-####