BLD-Final | 5/7/2019 | 5/7/2019 | 5/7/2019 | P | PASS |
Dave Hannah
|
|
|
per Dave H. over the phone, inspection pass
Zack Phone #: ###-####
|
BLD-Final | 4/19/2019 | 4/22/2019 | 4/22/2019 | A | PART |
Jim Storey
|
|
|
Zack Phone #: ###-#### health dept sign off/ mech permit resolved// ok to final upon all others sign offs
|
BLD-Final | 4/18/2019 | 4/19/2019 | 4/19/2019 | P | NR |
Brandon Shaw
|
|
|
Need to have permit and plans readily available... Install all grab bars in ADA bathroom...
|
FIRE-Final Inspection | 4/18/2019 | 4/19/2019 | 4/19/2019 | A | PASS |
Mark Scharfen
|
|
|
Life saftey inspection complete. Zack will hang extinguishers before Building inspection.
Zack Phone #: ###-####
|
FIRE-Final Inspection | 4/16/2019 | 4/16/2019 | 4/16/2019 | P | FAIL |
Troy Cobbley
|
|
|
The contractor actually just wanted a conference. I noted that the project related fire sprinkler pemit has not been finaled and the city approved plans indicate panic hardware at the rear exit door so panic hardware may be required at the front exit door from the space. The plans indicate that hardware is to be provided if not existing but not what type of hardware. Will also need exit signs and emergency lights placed as per plans. It does not appear to be any fire alarm notification devices with-in the space. Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/1/2019 | 4/2/2019 | 4/2/2019 | A | PASS |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/27/2019 | 3/27/2019 | 3/28/2019 | P | NR |
Dave Hannah
|
|
|
Zach Phone #: ###-####
|
BLD-Framing/Rough-in | 2/22/2019 | 2/22/2019 | 2/22/2019 | P | PEND |
Dave Hannah
|
|
|
Zack Phone #: ###-#### plumbing location of toilet not in rigth spot and no grab bar backing
|
BLD-Framing/Rough-in | 2/12/2019 | 2/13/2019 | 2/13/2019 | A | PASS |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|