Permit Information
Permit NumberBLD18-03500
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 6153 E HOOTOWL DR
Project NameHARRIS NORTH #2 LOT 83 BLOCK 1
Customer Number 
ePlanReviewYes
Description
W.U.I. Hillside, Class A Roof Required. Permit for the construction of a new 3590 sq. ft., two story (first story 1887 sq. ft., second story 1703 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 272 sq. ft. of covered patio/porch and a 846 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. SP-01 zoning and setbacks per planning. ***RDP***

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/13/20195/13/20195/13/2019PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Gus Brandon
DOC - Permit Finaled5/13/20195/13/20195/13/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results5/13/20195/13/20195/13/2019PDONE
DetailsBrandon Shaw
ACH50- 4.5
BLD-Other5/13/20195/13/20195/13/2019PCANC
DetailsBrandon Shaw
Drainage test and landscaping final Phone #: ###-#### Inspection requested via web by Gus Brandon
BLD-Other2/18/20192/19/20192/19/2019PPASS
DetailsBrandon Shaw
Soffit Please Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Energy code compliance2/13/20192/13/20192/13/2019PPASS
DetailsBrandon Shaw
Work in progress
BLD-Energy code compliance2/11/20192/12/20192/12/2019PNR
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in2/8/20192/8/20192/11/2019PPART
DetailsBrandon Shaw
Per plans- (3) 2x6 header needed at man door from garage...
Anchor bolts to be no more than 12" from ends of sill plate...
Positive connection required for 3 ply truss in garage, see orange paint...
BLD-Wall Bracing1/24/20191/24/20191/24/2019PCANC
DetailsBrandon Shaw
Work in progress...
First floor only...
BLD-Foundation12/11/201812/11/201812/11/2018PPASS
DetailsBrandon Shaw
Work in progress...
Frost protection is required...
BLD-Footing12/10/201812/10/201812/10/2018APASS
DetailsBrandon Shaw
Work in progress...
Frost protection required...
BLD-Footing12/6/201812/7/201812/7/2018ANR
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing12/6/201812/6/201812/6/2018PFAIL
DetailsBrandon Shaw
As per ACI 318... forms, rebar, and soil sub-grade to be a minimum 35 F...

At itme of inspection, average sub-grade temp 11-32 F...