BLD-Final | 7/8/2019 | 7/10/2019 | 7/10/2019 | A | PASS |
Dave Hannah
|
|
|
Nate Phone #: ###-####
|
DOC - Permit Finaled | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Blower Door Test Results | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Dave Hannah
|
|
|
5.0
|
BLD-Energy code compliance | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | PASS |
Dave Hannah
|
|
|
Nate Phone #: ###-####
|
BLD-Framing/Rough-in | 3/6/2019 | 3/6/2019 | 3/14/2019 | P | PASS |
Dave Hannah
|
|
|
Nate Phone #: ###-####
|
BLD-Conference | 3/7/2019 | 3/7/2019 | 3/7/2019 | P | PASS |
Dave Hannah
|
|
|
Nate Phone #: ###-####
|
BLD-Conference | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | PART |
Jim Storey
|
|
|
Nate Phone #: ###-#### ok to insulate pending c/n idems
|
BLD-Framing/Rough-in | 2/28/2019 | 3/4/2019 | 3/4/2019 | A | NR |
Jim Storey
|
|
|
Nate Phone #: ###-#### riser height to high/ header needed at fireplace flue// need truss engineering.
|
BLD-Wall Bracing | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | PASS |
Jim Sly
|
|
|
Nate Phone #: ###-#### Exterior Nailing Only.....OK.
|
BLD-Foundation | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Dave Hannah
|
|
|
Brandon Phone #: ###-####-pour time 4:00
|
BLD-Footing | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Dave Hannah
|
|
|
Brandon-we think it''s already been inspected but may need signed off Phone #: ###-####
|