BLD-Final | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PASS |
Tony Young
|
|
|
Please give me 30 minutes heads up and I will meet you there thank you Phone #: ###-#### Inspection requested via web by bryan murdoch
|
DOC - Permit Finaled | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 12/3/2019 | 12/3/2019 | 12/4/2019 | P | PASS |
Tony Young
|
|
|
Please give me 30 minutes heads up and I will meet you there thank you Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Final | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | PART |
Tony Young
|
|
|
30 minutes notice please Phone #: ###-#### Inspection requested via web by bryan murdoch,, needs letter of ok from the engineering on the cable guardrail and the final electrical on the spa
|
BLD-Other | 10/21/2019 | 10/21/2019 | 10/21/2019 | P | NR |
Tony Young
|
|
|
Brain Phone #: ###-####,, walk through only,, needs hillside, trades,,hand rails, guards etc..
|
BLD-Other | 10/17/2019 | 10/18/2019 | 10/18/2019 | P | CANC |
Tony Young
|
|
|
Courtesy inspection I do not have my handrail complete but need to make sure I have everything else thank you Phone #: ###-#### >> Inspection requested via web by bryan murdoch Inspection cancelled from web by: bryan murdoch
|
BLD-Energy code compliance | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | PASS |
Dave Hannah
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | PART |
Tony Young
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch,, minor corrections,, ok to insulate
|
BLD-Wall Bracing | 5/6/2019 | 5/7/2019 | 5/7/2019 | P | PART |
Tony Young
|
|
|
Thanks. Jim the Framer will be there. Phone #: ###-#### Inspection requested via web by bryan murdoch,, needs to get designer ok for changes from plan,, missed hold downs?,, shear panel size changes,, nailing on other areas ok
|
BLD-Foundation | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | PART |
Tony Young
|
|
|
As early as possible Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru,, work in progress
|
BLD-Footing | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | PART |
Tony Young
|
|
|
ready around 3pm.. Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate... work in progress
|
BLD-Footing | 3/11/2019 | 3/11/2019 | 3/12/2019 | P | NR |
Tony Young
|
|
|
As late as possible Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru
|
BLD-Footing | 3/11/2019 | 3/12/2019 | 3/12/2019 | A | NR |
Tony Young
|
|
|
As late as possible Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru
|