Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberBLD18-03973
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2406 S TRAPPER PL
Project NameHighland Manor HN 30-1
Customer Number 
ePlanReviewYes
Description
PLAN MOD for 2-3 ft retaining wall***Prescriptive component energy approach*** WUI Zone A requirements*** Permit for the construction of a new 3674 sq. ft., two story (first story 1971 sq. ft., second story 1703 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 272 sq. ft. of covered patio/porch and a 993 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. MDH
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/15/20197/16/20197/16/2019APASS
DetailsBrandon Shaw
Less Phone #: ###-####
DOC - Permit Finaled7/16/20197/16/20197/16/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results7/16/20197/16/20197/16/2019ADONE
DetailsBrandon Shaw
ACH50- 3.92
BLD-Other2/25/20192/25/20192/25/2019PPASS
DetailsBrandon Shaw
sofit // Les Phone #: ###-####
BLD-Energy code compliance2/20/20192/21/20192/21/2019APASS
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Framing/Rough-in2/19/20192/19/20192/19/2019PPASS
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Wall Bracing2/1/20192/4/20192/4/2019APART
DetailsBrandon Shaw
First floor only...
Work in progress...
BLD-Foundation12/26/201812/26/201812/26/2018PPASS
DetailsDave Hannah
Edgar Phone #: ###-####
BLD-Footing12/18/201812/18/201812/18/2018PPASS
DetailsBrandon Shaw
work in progress