Information based on query as of Wednesday, May 1, 2024.
Permit Information
Permit NumberBLD18-04314
StatusFinaled
Name HUNTER FAMILY TRUST
Site Address 2671 E RHYOLITE CT
Project NameADU-Hunter Casita Addition
Customer Number 
ePlanReviewYes
Description
Modification - adding a 132sq' 2nd level deck 4.7.20 **JAB** MODIFICATION OF +/-30' OF RETAINING WALL TO STONE INSTEAD OF CONCRETE 12-13-19 **jab** CAT II Hillside permit. WUI - SPECIAL INSPECTIONS FOR CONCRETE, SOILS, & HOLLOW-CORE PANELS - Permit for a 600sq' basement level Accessory Dwelling below a grade level 600sq' garage. There will be deferred submittals of engineeering for the hollow-core floor panels. All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/2/20207/6/20207/6/2020APASS
DetailsBrandon Shaw
Call ahead for access Josh Phone #: ###-####
DOC - Permit Finaled7/6/20207/6/20207/6/2020PPASS
DetailsBrandon Shaw
BLD-Final6/18/20206/18/20206/18/2020PNR
DetailsBrandon Shaw
Need PW approval...
BLD-Aging Inspection4/15/20204/15/20204/15/2020 DEFR
DetailsBrandon Shaw
Extend Permit 90/180 days4/15/20204/15/20204/15/2020PDONE
DetailsBrandon Shaw
BLD-Framing/Rough-in12/2/201912/3/201912/3/2019APART
DetailsBrandon Shaw
Garage cover pending Ele approval...
ADU ok insulate...
BLD-Wall Bracing10/11/201910/11/201910/11/2019PPASS
DetailsBrandon Shaw
Josh Phone #: ###-####
BLD-Footing7/17/20197/18/20197/18/2019APASS
DetailsBrandon Shaw
Work in progress...