BLD-Final | 3/2/2020 | 3/3/2020 | 3/3/2020 | P | PASS |
Tony Young
|
|
|
Need final walkthrough on corrections; window tempered, window opening restrictions and landings for French doors. Thanks! Phone #: ###-#### Inspection requested via web by Beau Brazier// recomended for historic award,, c of c issued
|
DOC - Permit Finaled | 3/3/2020 | 3/3/2020 | 3/3/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | PART |
Tony Young
|
|
|
Electrical inspected / finaled today, 01/23, and need BLD-Final. Call if any questions. Thanks! Phone #: ###-#### Inspection requested via web by Beau Brazier// walk through,, c/n on windows, tempered and opening restrictions on bedroom windows within 24",, needs landings for out swing doors//
|
BLD-Aging Inspection | 12/27/2019 | 12/27/2019 | 12/31/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 8/13/2019 | 8/14/2019 | 8/14/2019 | A | PASS |
Brandon Shaw
|
|
|
Ready for inspection this afternoon, if available, otherwise Weds AM works. Thanks! Beau Phone #: ###-#### Inspection requested via web by Beau Brazier
|
BLD-Framing/Rough-in | 7/22/2019 | 7/22/2019 | 7/22/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Beau Brazier ok to insulate need to fire block fur outs and fur downs
|
BLD-Framing/Rough-in | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | NR |
Tony Young
|
|
|
Framing rough in at 1405 N 14th. Thanks, Beau Phone #: ###-#### Inspection requested via web by Beau Brazier,, frame walk through only
|
BLD-Foundation | 3/19/2019 | 3/20/2019 | 3/20/2019 | A | PART |
Tony Young
|
|
|
Foundation inspection for 1405 N.14th. Thanks! Phone #: ###-#### Inspection requested via web by Beau Brazier,, front bay wall,, addition walls,, point loads on south for beam loads
|
BLD-Footing | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | PART |
Tony Young
|
|
|
Footing inspection for 1405 N 14th St. Thanks! Beau Phone #: ###-#### Inspection requested via web by Beau Brazier,, kitchen, point loads, and bay window restructure
|
BLD-Other | 2/25/2019 | 2/26/2019 | 2/26/2019 | A | PART |
Tony Young
|
|
|
Keeping Inspector informed of progress, inspection. Phone #: ###-#### Inspection requested via web by Beau Brazier// footings infill, other various inspections on frame..
|
BLD-Foundation | 2/6/2019 | 2/7/2019 | 2/7/2019 | A | PART |
Tony Young
|
|
|
Inspection for foundation on northwest corner of property Phone #: ###-#### Inspection requested via web by Beau Brazier,, icf block,, 8" ok,, northwest corner ok
|
BLD-Footing | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Beau Brazier// north west corner area
|
BLD-Footing | 1/25/2019 | 1/25/2019 | 1/25/2019 | P | FAIL |
Mike Jordan
|
|
|
Need inspection for footings under remodel. Thanks! Beau Phone #: ###-#### Inspection requested via web by Beau Brazier. rebar not per the engineering. Will reschedule for Monday.
|
BLD-Other | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | DONE |
Jim Sly
|
|
|
Would like preliminary review of foundation and footings before we pour. Thanks. Beau Phone #: ###-#### Inspection requested via web by Beau Brazier Recommendation...... Keep Engineer and Inspector for this area in the loop.....call for Conference inspection.
|