BLD-Framing/Rough-in | 6/23/2020 | 6/24/2020 | 6/24/2020 | A | PART |
Dave Hannah
|
|
|
screened // Charlie Phone #: ###-####
|
BLD-Framing/Rough-in | 3/20/2020 | 3/23/2020 | 3/23/2020 | A | PASS |
Dave Hannah
|
|
|
Steven Phone #: ###-####
|
BLD-Framing/Rough-in | 2/24/2020 | 2/25/2020 | 2/26/2020 | A | PART |
Dave Hannah
|
|
|
Steven Phone #: ###-#### lower level se section ok all but for restrooms
|
BLD-Framing/Rough-in | 2/13/2020 | 2/14/2020 | 2/14/2020 | P | PART |
Brandon Shaw
|
|
|
Charlie Phone #: ###-####
|
BLD-Concrete | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | DONE |
Dave Hannah
|
|
|
slab // Brian Phone #: ###-####
|
BLD-Foundation | 10/1/2019 | 10/2/2019 | 10/4/2019 | A | PEND |
Dave Hannah
|
|
|
Brain Phone #: ###-#### ok after spec insp sing off
|
BLD-Foundation | 9/24/2019 | 9/25/2019 | 9/25/2019 | P | DEFR |
Jim Storey
|
|
|
1pm please- Brian Phone #: ###-#### placed with si .
|
BLD-Foundation | 8/8/2019 | 8/9/2019 | 8/16/2019 | A | PASS |
Dave Hannah
|
|
|
rebar-Brain Phone #: ###-####-plan mod is for the elevator
|
BLD-Foundation | 8/15/2019 | 8/15/2019 | 8/16/2019 | P | PASS |
Dave Hannah
|
|
|
Brian Phone #: ###-####
|
BLD-Foundation | 7/31/2019 | 8/1/2019 | 8/1/2019 | A | PEND |
Brandon Shaw
|
|
|
Ok after spec inspection sign offs...
|
BLD-Foundation | 7/26/2019 | 7/29/2019 | 7/30/2019 | A | PEND |
Dave Hannah
|
|
|
rebar // Brian Phone #: ###-#### ok after spec inspection sign offs
|
BLD-Concrete | 7/25/2019 | 7/25/2019 | 7/26/2019 | P | PEND |
Dave Hannah
|
|
|
wall rebar- Brian Phone #: ###-#### ok after spec inspection sign offs
|
BLD-Foundation | 7/17/2019 | 7/17/2019 | 7/18/2019 | P | PASS |
Dave Hannah
|
|
|
Brian Phone #: ###-####
|
BLD-Foundation | 7/11/2019 | 7/12/2019 | 7/12/2019 | A | PASS |
Dave Hannah
|
|
|
brain Phone #: ###-####
|
BLD-Foundation | 7/10/2019 | 7/11/2019 | 7/12/2019 | A | PASS |
Dave Hannah
|
|
|
Brian- inspection is for CB line Phone #: ###-####
|
BLD-Foundation | 6/25/2019 | 6/26/2019 | 6/26/2019 | A | PASS |
Brandon Shaw
|
|
|
west side of the cup // Brian Phone #: ###-####
|
BLD-Footing | 6/24/2019 | 6/25/2019 | 6/26/2019 | A | PASS |
Dave Hannah
|
|
|
PD line // Brian Phone #: ###-####
|
BLD-Framing/Rough-in | 2/3/2020 | 2/3/2020 | | P | |
Dave Hannah
|
|
|
Charlie- framing walls for level G ( nothing to do with plan mod) Phone #: ###-####
|