Permit Information
Permit NumberBLD18-04435
StatusReady to Issue
Name LAYTON CONSTRUCTION
Site Address 111 W STATE ST
Project NameSt. Luke's Central Plant
Customer Number 
ePlanReviewYes
Description
(St. Luke’s) **PROJECT MANAGEMENT – Special inspection are required. ""DEFERRED SUBMITTALS FOR THE TRANSVAC SYSTEM 5/20/20"" ""PLAN MODIFICATION TO CHANGE THE ELEVATORS FROM HYDRAULIC TO TRACTION STYLE"" The Central Plant houses all major heating and cooling equipment for the downtown campus. A variety of logistic and mechanical functions are connected to the Existing Hospital and North Tower through a new tunnel system. This project also supports regular access and emergency egress from both the NW Parking Garage and 1st Street MOP. This is an 75,410 SF "Mixed Occupancy" building made up of the 52,983 SF Central Plant, 15,771 SF MOP elevator and stair tower and a 6,656 sq. ft. below grade pedestrian walkway and associated storage room (area of storage room is included in the area of the MOP) The building is six stories above grade and two stories below grade. The structure of the building consists of concrete columns and beams with monolithic concrete slabs. The façade is brick with curtain wall, and louvered openings and screening. All work per the approved plans. This building is fully fire sprinklered for Fire flow and area. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in6/23/20206/24/20206/24/2020APART
DetailsDave Hannah
screened // Charlie Phone #: ###-####
BLD-Framing/Rough-in3/20/20203/23/20203/23/2020APASS
DetailsDave Hannah
Steven Phone #: ###-####
BLD-Framing/Rough-in2/24/20202/25/20202/26/2020APART
DetailsDave Hannah
Steven Phone #: ###-#### lower level se section ok all but for restrooms
BLD-Framing/Rough-in2/13/20202/14/20202/14/2020PPART
DetailsBrandon Shaw
Charlie Phone #: ###-####
BLD-Concrete11/6/201911/7/201911/7/2019ADONE
DetailsDave Hannah
slab // Brian Phone #: ###-####
BLD-Foundation10/1/201910/2/201910/4/2019APEND
DetailsDave Hannah
Brain Phone #: ###-#### ok after spec insp sing off
BLD-Foundation9/24/20199/25/20199/25/2019PDEFR
DetailsJim Storey
1pm please- Brian Phone #: ###-#### placed with si .
BLD-Foundation8/8/20198/9/20198/16/2019APASS
DetailsDave Hannah
rebar-Brain Phone #: ###-####-plan mod is for the elevator
BLD-Foundation8/15/20198/15/20198/16/2019PPASS
DetailsDave Hannah
Brian Phone #: ###-####
BLD-Foundation7/31/20198/1/20198/1/2019APEND
DetailsBrandon Shaw
Ok after spec inspection sign offs...
BLD-Foundation7/26/20197/29/20197/30/2019APEND
DetailsDave Hannah
rebar // Brian Phone #: ###-#### ok after spec inspection sign offs
BLD-Concrete7/25/20197/25/20197/26/2019PPEND
DetailsDave Hannah
wall rebar- Brian Phone #: ###-#### ok after spec inspection sign offs
BLD-Foundation7/17/20197/17/20197/18/2019PPASS
DetailsDave Hannah
Brian Phone #: ###-####
BLD-Foundation7/11/20197/12/20197/12/2019APASS
DetailsDave Hannah
brain Phone #: ###-####
BLD-Foundation7/10/20197/11/20197/12/2019APASS
DetailsDave Hannah
Brian- inspection is for CB line Phone #: ###-####
BLD-Foundation6/25/20196/26/20196/26/2019APASS
DetailsBrandon Shaw
west side of the cup // Brian Phone #: ###-####
BLD-Footing6/24/20196/25/20196/26/2019APASS
DetailsDave Hannah
PD line // Brian Phone #: ###-####
BLD-Framing/Rough-in2/3/20202/3/2020 P 
DetailsDave Hannah
Charlie- framing walls for level G ( nothing to do with plan mod) Phone #: ###-####