Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberBLD18-04438
StatusIssued
Name MIKE LANDA
Site Address 5379 W KENDALL ST
Project NameIdaho Kombucha
Customer Number 
ePlanReviewYes
Description
(IDAHO KOMBUCHA) This building is NOT fire sprinkled. Racking over 8'-0" requires a seperate permit. Permit for a tenant improvement for an existing warehouse space to add equipment for the brewing, fermenting and bottling of Kombucha with work to include the addition of the following: 12'-0 x 20'-0" walk in cooler with chiller located in secure enclosure outside, (12) fermenter tanks, (1) on-demand water heater, (1) 50 gal electric tank water heater, (1) prep sink, (1) 3-compartment sink, handwash sink, (1) 8'-0" trench drain, (3) brite tanks, (1) backflow preventer valve, replace (1) mop sink, (1) RO water filtering system, (1) handwash sink, (1) 2x6 non load bearing plumbing wall, flooring and finishes, grab bars in the restrooms. Interior finishes in compliance with Ch. 8 of the 2015 IBC. This building is not sprinklered. **MDH**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection8/22/20198/23/20198/23/2019APASS
DetailsTroy Cobbley
Life safety passed. CO2 detector installed and glycol system installed at 35 gallon max.

Mike Phone #: ###-####
BLD-Final3/14/20193/15/20193/15/2019PPART
DetailsJim Sly
Mike Phone #: ###-####
OK for Temp. Occ. OK for Perm. Occ. when Fire and Mech. signs off........Perm.
FIRE-Final Inspection3/14/20193/15/20193/15/2019ACANC
DetailsJim Page
Duplicate inspection request, this request is cancelled.

mike Phone #: ###-####
FIRE-Final Inspection3/14/20193/15/20193/15/2019APART
DetailsJim Page
Partial final inspection for life fire safety complete. Glycol system and CO2 have not been installed yet, CO2 will require a detection aoarm due to amount being used. TCO for life fire safety is complete, a follow up inspection will be required after permenant CO2 system and glycol system is installed.

Duplicate inspection request, this request is cancelled.

Mike Phone #: ###-####
BLD-Ceiling Grid Inspection2/27/20192/27/20192/28/2019PPASS
DetailsJim Sly
Mike Phone #: ###-####
FIRE-Conference2/27/20192/27/20192/27/2019PDONE
DetailsTroy Cobbley
Met with Mike discussed requirements needed for final. Mike mentioned not having glycol system installed in time for final so we gave him Ron Johnson's phone and email to discuss possible TCO when they are ready.

Mike Phone #: ###-####