Information based on query as of Wednesday, May 15, 2024.
Permit Information
Permit NumberBLD18-04441
StatusFinaled
Name BERKELEY BUILDING COMPANY INC
Site Address 7573 S WAGONS VIEW AVE
Project Name12/7 Bonneville Pointe #2
Customer Number 
ePlanReviewYes
Description
WUI VALLEY, INTERIOR LOT, ZONE "B" REQUIREMENTS, CLASS "A " ROOF REQUIRED. Permit for the construction of a new 3678 sq. ft., two story (first story 1797 sq. ft., second story 1881 sq. ft.) single family dwelling with 6 bedrooms, 3.5 bathrooms, approximately 329 sq. ft. of covered patio/porch and a 1089 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. Prescriptive Energy Code proposed. ***BJM***
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/22/20195/23/20195/23/2019APASS
DetailsJim Storey
Garage code 1207 Phone #: ###-#### Inspection requested via web by Elena Stephens
DOC - Permit Finaled5/23/20195/23/20195/23/2019PPASS
DetailsJim Storey
BLD-Blower Door Test Results5/22/20195/23/20195/23/2019ADONE
DetailsJim Storey
4.3
BLD-Energy code compliance3/15/20193/15/20193/15/2019PPASS
DetailsJim Storey
Inspection requested via web by Marc Foote
BLD-Framing/Rough-in3/15/20193/15/20193/15/2019PPASS
DetailsJim Storey
Inspection requested via web by Marc Foote
BLD-Energy code compliance3/14/20193/14/20193/14/2019PCANC
DetailsJim Storey
>> Inspection requested via web by Marc Foote Inspection cancelled from web by: Marc Foote
BLD-Framing/Rough-in3/14/20193/14/20193/14/2019PCANC
DetailsJim Storey
>> Inspection requested via web by Marc Foote Inspection cancelled from web by: Marc Foote
BLD-Framing/Rough-in3/12/20193/12/20193/12/2019PFAIL
DetailsBrandon Shaw
No corrections made...
Extend Permit 90/180 days3/12/20193/12/20193/12/2019PPART
DetailsJim Storey
ok to insulate/ engineer letter pending
BLD-Framing/Rough-in3/11/20193/11/20193/11/2019PFAIL
DetailsJim Storey
Inspection requested via web by Marc Foote hangers over nailled penatration below face of hangers/ have hanger rep field review the instal and sub mit letter as how to fix.// plm over dril 40 to 60% must be doubled.
BLD-Wall Bracing3/11/20193/11/20193/11/2019PPASS
DetailsJim Storey
Inspection requested via web by Marc Foote
BLD-Wall Bracing2/18/20192/19/20192/19/2019APEND
DetailsBrandon Shaw
Nail up stairs wall brace panels per plans- edge and field...
BLD-Wall Bracing2/14/20192/15/20192/15/2019PFAIL
DetailsBrandon Shaw
Finish nailing all wall brace panels, edge/field nailng, blocking...
Need Engineering approval for over driven and missing nail heads with in all straps, see plans for locations...
BLD-Footing1/2/20191/3/20191/3/2019PPASS
DetailsJim Storey
Will be ready to pour at 1:00. Inspection requested via web by Marc Foote