Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD18-04465
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2400 S TRAPPER PL
Project NameHarris North #1 Lot 29 Block 0
Customer Number 
ePlanReviewYes
Description
HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 3,910 sq. ft., two story (first story 2,705 sq. ft., second story 1,205 sq. ft.) single family dwelling with 5 bedrooms, 4.5 bathrooms, approximately 313 sq. ft. of covered patio/porch and a 933 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. ***BJM*** Prescriptive Energy Code proposed. AN NFPA 13D FIRE SPRINKLER SYSTEM IS TO BE PROVIDED, AS NOTED ON THE DRAWINGS. LGMA letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/30/20197/31/20197/31/2019APASS
DetailsBrandon Shaw
Les Phone #: ###-####
DOC - Permit Finaled7/31/20197/31/20197/31/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results7/31/20197/31/20197/31/2019ADONE
DetailsBrandon Shaw
ACH50- 3.9
BLD-Final7/30/20197/30/20197/30/2019PCANC
DetailsBrandon Shaw
Less Phone #: ###-####
BLD-Final7/29/20197/30/20197/30/2019ACANC
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Energy code compliance4/16/20194/17/20194/17/2019APASS
DetailsBrandon Shaw
les Phone #: ###-####
BLD-Other4/15/20194/15/20194/15/2019PPASS
DetailsBrandon Shaw
Soffit
BLD-Framing/Rough-in4/15/20194/15/20194/15/2019PPASS
DetailsBrandon Shaw
OK to insulate...
BLD-Framing/Rough-in4/12/20194/12/20194/12/2019PNR
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in4/10/20194/11/20194/11/2019ANR
DetailsBrandon Shaw
Need Fire rough-in...
BLD-Wall Bracing3/22/20193/22/20193/22/2019PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Foundation2/5/20192/6/20192/6/2019APASS
DetailsBrandon Shaw
Work in progress...
Frost protection is required...
BLD-Footing1/31/20191/31/20191/31/2019PPASS
DetailsBrandon Shaw
Work in progress