BLD-Final | 6/25/2020 | 6/26/2020 | 6/26/2020 | A | PASS |
Tell Riley
|
|
|
David Phone #: ###-####//corrections made//final complete//
|
DOC - Permit Finaled | 6/26/2020 | 6/26/2020 | 6/26/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Blower Door Test Results | 6/26/2020 | 6/26/2020 | 6/26/2020 | P | CANC |
Tell Riley
|
|
|
2.88 ACH 50
|
BLD-Final | 6/22/2020 | 6/23/2020 | 6/23/2020 | P | NR |
Tell Riley
|
|
|
David Phone #: ###-####//CN posted//still an active ele permit//need mechanical final//need blower door test completed and post results//please provide city approved plans and documents//
|
BLD-Aging Inspection | 3/20/2020 | 3/20/2020 | 3/20/2020 | | PASS |
Tell Riley
|
|
|
wip
|
BLD-Energy code compliance | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PASS |
Tell Riley
|
|
|
David Phone #: ###-####//corrections made//
|
BLD-Framing/Rough-in | 11/4/2019 | 11/5/2019 | 11/5/2019 | A | PART |
Tell Riley
|
|
|
David Phone #: ###-####//need trus engineering for cut truss//add truss bracing per truss plans//ok to insulate only//
|
BLD-Wall Bracing | 10/14/2019 | 10/15/2019 | 10/15/2019 | P | PART |
Tell Riley
|
|
|
Dave Phone #: ###-####//add shear blocks where noted//nailing ok//add shear at truss heels per plans--will check at framing//exterior walls only//
|
BLD-Footing | 9/13/2019 | 9/16/2019 | 9/16/2019 | A | PASS |
Tell Riley
|
|
|
David Phone #: ###-####//setbacks and footings ok per plans///
|