BLD-Final | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | PASS |
Mike Jordan
|
|
|
Garage code 7530 Phone #: ###-#### Inspection requested via web by Rustin Ray
|
DOC - Permit Finaled | 9/4/2019 | 9/4/2019 | 9/4/2019 | P | PASS |
Mike Jordan
|
|
|
All issues have been resolved. An additional handrail has been installed on opposite side of existing handrail.
|
BLD-Blower Door Test Results | 9/4/2019 | 9/4/2019 | 9/4/2019 | A | DONE |
Mike Jordan
|
|
|
5.6
|
BLD-Final | 7/31/2019 | 8/1/2019 | 8/1/2019 | A | FAIL |
Mike Jordan
|
|
|
Garage code 7530 Phone #: ###-#### Inspection requested via web by Rustin Ray. Provide blower door test results and post. Complte fire caulking in gargae. provide code compliant handrail.
|
BLD-Final | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | NR |
Mike Jordan
|
|
|
Garage code 7530 Phone #: ###-#### Inspection requested via web by Rustin Ray. Mech. final has failed.
|
BLD-Energy code compliance | 4/24/2019 | 4/25/2019 | 4/25/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Rustin Ray
|
BLD-Framing/Rough-in | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Rustin Ray
|
BLD-Wall Bracing | 4/2/2019 | 4/3/2019 | 4/3/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Rustin Ray
|
BLD-Foundation | 2/19/2019 | 2/19/2019 | 2/19/2019 | P | PASS |
Brandon Shaw
|
|
|
Previous enrty note error... Foundation is ok to pour...
|
BLD-Foundation | 2/15/2019 | 2/15/2019 | 2/15/2019 | P | NR |
Brandon Shaw
|
|
|
Need Geo sub-grade letter submitted and approved by PW...
|
BLD-Footing | 2/12/2019 | 2/13/2019 | 2/13/2019 | A | PART |
Mike Jordan
|
|
|
Darrin Phone #: ###-####, please go towards the end of the morning if possible, thank you
|