Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD19-00221
StatusFinaled
Name COVERTECH
Site Address 305 W THORNBERRY DR
Project NameSteve Hodson Pergola
Customer Number 
ePlanReviewYes
Description
*Hillside* Permit for 684sq' (18’x38’) of pre-engineered metal pergola. Footings to be 27”x27”x27” – cover will wall-mount. All work per plans, engineering, manufacturer’s specs, & local code. **JAB** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/27/20193/28/20193/28/2019ADONE
DetailsTony Young
Final can be done at anytime. Jimmy will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
DOC - Permit Finaled3/28/20193/28/20193/28/2019PPASS
DetailsTony Young
BLD-Footing3/19/20193/20/20193/20/2019ADONE
DetailsTony Young
Footing inspection can be done at anytime. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
BLD-Footing3/7/20193/8/20193/8/2019PPEND
DetailsTony Young
Footing inspection can be done anytime in the AM tomorrow. Call Jimmy ###-####, prior to inspection to ensure we can meet you up there and give you the subgrade inspection results. Phone #: ###-#### Inspection requested via web by rich prasch
BLD-Footing3/6/20193/7/20193/7/2019AFAIL
DetailsTony Young
Footing inspection can be done anytime in the AM tomorrow. Call Jimmy ###-####, prior to inspection to ensure we can meet you up there and give you the subgrade inspection results. Phone #: ###-#### Inspection requested via web by rich prasch,, needs soils report approved by public works, hillside 1st
BLD-Footing3/5/20193/6/20193/6/2019ANR
DetailsTony Young
Footing inspection can be done anytime in the AM tomorrow. Call Jimmy ###-####, prior to inspection to ensure we can meet you up there and give you the subgrade inspection results. Phone #: ###-#### Inspection requested via web by rich prasch,,needs soils approval 1st