BLD-Final | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 8/9/2019 | 8/12/2019 | 8/12/2019 | A | CANC |
Brandon Shaw
|
|
|
Breckin and Melissa need sign off Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Blower Door Test Results | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.45
|
BLD-Final | 8/7/2019 | 8/8/2019 | 8/8/2019 | P | NR |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Energy code compliance | 5/17/2019 | 5/17/2019 | 5/17/2019 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 5/15/2019 | 5/16/2019 | 5/16/2019 | A | FAIL |
Brandon Shaw
|
|
|
Per plans- 4x8 headers needed, 2 locations... Per plans- A35 at 12" o.c., see detail 2, pg. S1.1... Strap needed at break in double top plate... Fire blocking needed at flue chase, up stairs... OK to insulate...
|
BLD-Other | 5/14/2019 | 5/15/2019 | 5/15/2019 | P | PASS |
Brandon Shaw
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Wall Bracing | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Foundation | 3/22/2019 | 3/25/2019 | 3/25/2019 | A | PASS |
Brandon Shaw
|
|
|
Worl in progress...
|
BLD-Footing | 3/21/2019 | 3/21/2019 | 3/21/2019 | A | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
DOC - Permit Finaled | 3/21/2019 | 3/21/2019 | 3/21/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Footing | 3/20/2019 | 3/20/2019 | 3/20/2019 | A | NR |
Brandon Shaw
|
|
|
Need soil subgrade submitted and approved by PW...
|