BLD-Final | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
DOC - Permit Finaled | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.73
|
BLD-Energy code compliance | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | CANC |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Energy code compliance | 7/5/2019 | 7/5/2019 | 7/5/2019 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 6/27/2019 | 6/27/2019 | 6/27/2019 | P | PEND |
Brandon Shaw
|
|
|
Need Engineering approval for cut trusses A1- A4...
|
BLD-Other | 6/27/2019 | 6/27/2019 | 6/27/2019 | A | PASS |
Brandon Shaw
|
|
|
Soffit...
|
BLD-Final | 6/26/2019 | 6/27/2019 | 6/27/2019 | A | CANC |
Brandon Shaw
|
|
|
Less- safet inspection Phone #: ###-####
|
BLD-Wall Bracing | 6/7/2019 | 6/7/2019 | 6/7/2019 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Wall Bracing | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | PEND |
Brandon Shaw
|
|
|
Renail edge and field nailing as per plans...
|
BLD-Wall Bracing | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | FAIL |
Jim Storey
|
|
|
Les Phone #: ###-#### nails overdrinen at garage house covered w/o insp.
|
BLD-Foundation | 5/8/2019 | 5/8/2019 | 5/8/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 5/7/2019 | 5/7/2019 | 5/7/2019 | P | PASS |
Jim Storey
|
|
|
Dion-would like as late as possible Phone #: ###-####
|