Permit Information
Permit NumberBLD19-00711
StatusIssued
Name FLYNNER PROPERTIES LLC
Site Address 2467 N HEAVENS WAY
Project NameRolph Residence
Customer Number 
ePlanReviewYes
Description
CAT II HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMETNS, CLASS "A" ROOF REQUIRED. SPECIAL INSPECTIONS REQUIRED. SPRINKLERS REQUIRED. REScheck provided to show Energy Compliance. Permit for the construction of a new 4574 sq. ft., two story with a partial basement (first story 3223 sq. ft., second story 299 sq. ft., below grade 1052 sq.) single family dwelling with 5 bedrooms, 5.5 bathrooms, approximately 881 sq. ft. of covered patio/porch and a 845 sq. ft. attached garage per the approved plans and any notations. Engineering has been provided. A-1 zoning and setbacks per planning. ***BJM*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection. ***SPRINKLERS ARE REQUIRED*** LGM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Wall Bracing4/2/20204/6/20204/6/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Bob Fink
BLD-Foundation3/2/20203/2/20203/2/2020PPASS
DetailsBrandon Shaw
Work in progress...
Column, back patio/deck...
BLD-Concrete2/27/20202/28/20203/2/2020PNR
DetailsDave Hannah
Concrete wall rebar inspection. This is the last element of structural concrete on this project. Phone #: ###-#### Inspection requested via web by Bob Fink still working on rebar
BLD-Foundation1/7/20201/7/20201/7/2020APASS
DetailsBrandon Shaw
Work in progress...
BLD-Foundation1/6/20201/7/20201/7/2020ACANC
DetailsBrandon Shaw
Partial foundation inspection. Phone #: ###-#### Inspection requested via web by Bob Fink
BLD-Foundation12/20/201912/23/201912/23/2019PCANC
DetailsBrandon Shaw
BOB FINK CANCEL INSPECTION// Partial foundation inspection. Phone #: ###-#### >> Inspection requested via web by Bob Fink
BLD-Foundation12/15/201912/16/201912/16/2019PPASS
DetailsBrandon Shaw
Partial foundation inspection
Work in progress...
Frost protection is required...
BLD-Foundation12/13/201912/16/201912/15/2019ACANC
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by Bob Fink Inspection cancelled from web by: Bob Fink
BLD-Foundation11/22/201911/25/201911/25/2019PPASS
DetailsBrandon Shaw
Frost protection is required...
BLD-Footing10/21/201910/22/201910/22/2019APASS
DetailsBrandon Shaw
Work in progress...