Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberBLD19-00735
StatusFinaled
Name CM COMPANY
Site Address 800 E PARK BLVD
Project NameSt. Luke's IHT Offices
Customer Number 
ePlanReviewYes
Description
(ST. LUKE’S INTEGRATED HEALTH TECHNOLOGIES OFFICE – ENTIRE 3RD STORY – WASHINGTON GROUP PLAZA 4) The fire sprinkler system is used for high rise and to substitute for 1-hr rated corridors. To remodel the entire 3rd story of an existing high-rise building for a new office tenant having a total floor area of about 27,139 square feet. Some interior nonbearing walls will be removed. Work is to include interior nonbearing walls, both toilet rooms upgraded to be accessible to the disabled, new “high” and “low” drinking fountains, new ceiling tiles in the existing suspended ceiling grid, new 90 minute stairway enclosure doors, new elevator vestibule doors, new smoke-fire dampers where HVAC ducts and transfer openings penetrate shafts and where ducts penetrate elevator vestibules, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 (including replacing all heads with quick-response fire sprinklers) and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/19/201911/19/201911/19/2019PPASS
DetailsDave Hannah
Bruce Phone #: ###-####
BLD-Final10/4/201910/4/201910/4/2019PPART
DetailsDave Hannah
Bruce Phone #: ###-#### ok for temp tco
FIRE-Final Inspection10/4/201910/4/201910/4/2019APASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
BLD-Ceiling Grid Inspection9/26/20199/27/20199/27/2019PPASS
DetailsTony Young
Mike Phone #: ###-####// fire caulking complete
BLD-Ceiling Grid Inspection9/25/20199/26/20199/26/2019PPART
DetailsTell Riley
Mike Phone #: ###-####//need to fix mechanical penetrations through smoke barrier//need to seal penetration through smoke barrier in corridors//correction notice issued//ok to flood areas outside smoke or fire barriers//
BLD-Framing/Rough-in8/16/20198/16/20198/16/2019PPASS
DetailsDave Hannah
Dennis Phone #: ###-####
BLD-Ceiling Grid Inspection8/13/20198/14/20198/14/2019APART
DetailsDave Hannah
Bruce Phone #: ###-#### ne corner of 3rd fl ok to flood rest of floor ok to cut in bourders
BLD-Framing/Rough-in6/12/20196/13/20196/13/2019APASS
DetailsDave Hannah
bruce Phone #: ###-#### south half ok to cover walls
BLD-Framing/Rough-in6/3/20196/4/20196/4/2019APASS
DetailsDave Hannah
Dennis Phone #: ###-####