BLD-Final | 9/15/2019 | 9/16/2019 | 9/16/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.41
|
BLD-Final | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | NR |
Brandon Shaw
|
|
|
Need PW and Mech final...
|
BLD-Other | 6/22/2019 | 6/24/2019 | 6/24/2019 | A | CANC |
Brandon Shaw
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Energy code compliance | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 6/18/2019 | 6/18/2019 | 6/18/2019 | P | PEND |
Brandon Shaw
|
|
|
Per walk thru and S1.1 detail 3- Add floor joist for shear transfer...
|
BLD-Framing/Rough-in | 6/15/2019 | 6/17/2019 | 6/17/2019 | P | NR |
Brandon Shaw
|
|
|
See previous note- tighten hold down hardware...
|
BLD-Wall Bracing | 6/2/2019 | 6/3/2019 | 6/3/2019 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick nailling ok for cover// hold downs need nuts and finsh instal.
|
BLD-Wall Bracing | 5/31/2019 | 5/31/2019 | 5/31/2019 | P | NR |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Foundation | 4/29/2019 | 4/29/2019 | 4/29/2019 | A | PASS |
Dave Hannah
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 4/25/2019 | 4/25/2019 | 4/25/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | FAIL |
Brandon Shaw
|
|
|
Need soil subgrade submitted and approved by PW...
|
BLD-Footing | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | CANC |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|