Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD19-00962
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2895 S GREBE PL
Project NameHarris Ranch North #1
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 3355 sq. ft., two story (first story 1634 sq. ft., second story 1721 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 280 sq. ft. of covered patio/porch and a 920 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. ***RDP*** NO SPRINKLERS REQUIRED. ***LGM*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/15/20199/16/20199/16/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled9/16/20199/16/20199/16/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results9/13/20199/13/20199/13/2019PDONE
DetailsBrandon Shaw
ACH50- 4.41
BLD-Final9/13/20199/13/20199/13/2019PNR
DetailsBrandon Shaw
Need PW and Mech final...
BLD-Other6/22/20196/24/20196/24/2019ACANC
DetailsBrandon Shaw
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Energy code compliance6/19/20196/20/20196/20/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in6/18/20196/18/20196/18/2019PPEND
DetailsBrandon Shaw
Per walk thru and S1.1 detail 3- Add floor joist for shear transfer...
BLD-Framing/Rough-in6/15/20196/17/20196/17/2019PNR
DetailsBrandon Shaw
See previous note- tighten hold down hardware...
BLD-Wall Bracing6/2/20196/3/20196/3/2019APART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kyle Seick nailling ok for cover// hold downs need nuts and finsh instal.
BLD-Wall Bracing5/31/20195/31/20195/31/2019PNR
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Foundation4/29/20194/29/20194/29/2019APASS
DetailsDave Hannah
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing4/25/20194/25/20194/25/2019APASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing4/24/20194/24/20194/24/2019PFAIL
DetailsBrandon Shaw
Need soil subgrade submitted and approved by PW...
BLD-Footing4/22/20194/23/20194/23/2019ACANC
DetailsBrandon Shaw
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell