BLD-Final | 5/1/2020 | 5/4/2020 | 5/4/2020 | A | PEND |
Mike Jordan
|
|
|
Richard Phone #: ###-####. Will be ok for final once public works signs off.
|
BLD-Final | 4/23/2020 | 4/24/2020 | 4/28/2020 | P | NR |
Dave Hannah
|
|
|
screened // Richard Phone #: ###-#### needs hill side sign offs
|
BLD-Energy code compliance | 11/14/2019 | 11/15/2019 | 11/15/2019 | A | PASS |
Dave Hannah
|
|
|
Jace Phone #: ###-####
|
BLD-Framing/Rough-in | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
Dave Hannah
|
|
|
Dustin Phone #: ###-####
|
BLD-Framing/Rough-in | 11/5/2019 | 11/5/2019 | 11/6/2019 | P | NR |
Dave Hannah
|
|
|
Justin Phone #: ###-#### needs air seal
|
BLD-Wall Bracing | 10/16/2019 | 10/17/2019 | 10/17/2019 | A | PART |
Tell Riley
|
|
|
shear // dustin Phone #: ###-####//ok to cover main house areas//garage front needs added holddowns per plans--have designer provide alternate for post installed anchors in place of cast in place hold downs speced on plans//
|
BLD-Footing | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | PASS |
Brandon Shaw
|
|
|
Dustin Phone #: ###-####
|
BLD-Footing | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | NR |
Dave Hannah
|
|
|
Dustin Phone #: ###-#### needs geo tec on soils
|
BLD-Foundation | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | PASS |
Dave Hannah
|
|
|
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Footing | 7/18/2019 | 7/19/2019 | 7/19/2019 | A | PART |
Mike Jordan
|
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Footing | 7/18/2019 | 7/19/2019 | 7/18/2019 | A | CANC |
Dave Hannah
|
|
|
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Footing | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | NR |
Dave Hannah
|
|
|
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|