Permit Information
Permit NumberBLD19-01157
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2427 S TRAPPER PL
Project NameHarris North Lot 3 Block 1
Customer Number 
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2970 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 375 sq. ft. of covered patio/porch and a 828 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. JJN NO SPRINKLERS REQUIRED. LGM
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/31/201910/31/201910/31/2019PPASS
DetailsBrandon Shaw
Les Phone #: ###-####
DOC - Permit Finaled10/31/201910/31/201910/31/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results10/31/201910/31/201910/31/2019PDONE
DetailsBrandon Shaw
ACH50- 3.78
BLD-Energy code compliance7/18/20197/18/20197/18/2019PPASS
DetailsBrandon Shaw
LES Phone #: ###-####
BLD-Framing/Rough-in7/3/20197/5/20197/5/2019APART
DetailsBrandon Shaw
Pending corrections- Straps at break in double top plates, drill and install hold downs per plans, point laod to bear down to foundation...
See red crayon...
BLD-Wall Bracing6/11/20196/11/20196/11/2019PPASS
DetailsBrandon Shaw
Work in progress...
Hold downs to be installed by framing rough-in...
BLD-Foundation5/16/20195/17/20195/17/2019ACANC
DetailsBrandon Shaw
Jerry Phone #: ###-####
BLD-Wall Bracing5/16/20195/16/20195/17/2019PPASS
DetailsBrandon Shaw
Foundation...
Work in progress...
BLD-Footing5/15/20195/15/20195/15/2019PPASS
DetailsBrandon Shaw
Work in progress...