BLD-Final | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | PASS |
Dave Hannah
|
|
|
Josiah- please call prior Phone #: ###-####
|
DOC - Permit Finaled | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 10/4/2019 | 10/4/2019 | 10/8/2019 | P | PEND |
Dave Hannah
|
|
|
as late as possible.. call when on the way // josiah Phone #: ###-####
|
BLD-Energy code compliance | 7/26/2019 | 7/26/2019 | 7/27/2019 | P | PASS |
Dave Hannah
|
|
|
Joshia-as late as possible Phone #: ###-####
|
BLD-Framing/Rough-in | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | PASS |
Dave Hannah
|
|
|
DJosiah Phone #: 2###-####
|
BLD-Wall Bracing | 6/24/2019 | 6/24/2019 | 6/26/2019 | P | PASS |
Dave Hannah
|
|
|
Josiah Phone #: ###-####
|
BLD-Foundation | 5/24/2019 | 5/24/2019 | 5/28/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Other | 5/23/2019 | 5/24/2019 | 5/24/2019 | A | PASS |
Dave Hannah
|
|
|
Josiah- wall stem inspection and please go in the early afternoon, thank you. Phone #: ###-####
|
BLD-Footing | 5/22/2019 | 5/23/2019 | 5/23/2019 | P | PASS |
Dave Hannah
|
|
|
early if possible // josiah Phone #: ###-####
|