BLD-Final | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | PART |
Tell Riley
|
|
|
ryan sent verification of smoke CO combo in loft area//verified final mechanical passed//final is complete//
|
DOC - Permit Finaled | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 12/6/2019 | 12/9/2019 | 12/9/2019 | A | FAIL |
Tell Riley
|
|
|
Ryan Phone #: ###-####//mechanical was not pulled--will need mechanical inspection//add combo smoke carbon monoxide detector in bonus area//
|
BLD-Final | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | NR |
Tell Riley
|
|
|
Ryan Phone #: ###-####//needs electrical final///
|
BLD-Energy code compliance | 9/5/2019 | 9/6/2019 | 9/6/2019 | P | PASS |
Tell Riley
|
|
|
RYAN Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 9/5/2019 | 9/6/2019 | 9/5/2019 | A | CANC |
Tell Riley
|
|
|
CANCEL BY BRIAN- wrong inspection schedule- Brian Phone #: ###-####
|
BLD-Framing/Rough-in | 8/29/2019 | 8/30/2019 | 8/30/2019 | P | PART |
Mike Jordan
|
|
|
Gabe Phone #: ###-####. Needs to add lateral bracing to existing trusses over living room as per the engineering. Fireblock mech. chase at ceiling level. Verify 4x6 post load path to footing below. ok to insulate.
|
BLD-Foundation | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | PASS |
Tell Riley
|
|
|
Gave Phone #: ###-####//footing/foundation mono pour//rebar installed per plans// setbacks per plans//
|