BLD-Final | 11/5/2019 | 11/5/2019 | 11/5/2019 | A | PASS |
Jim Storey
|
|
|
Access is 9378 Phone #: ###-#### Inspection requested via web by jarrod nelson
|
DOC - Permit Finaled | 11/5/2019 | 11/5/2019 | 11/5/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 11/5/2019 | 11/5/2019 | 11/5/2019 | P | DONE |
Jim Storey
|
|
|
Access is 9378 Phone #: ###-#### Inspection requested via web by jarrod nelson 5.2
|
BLD-Energy code compliance | 9/6/2019 | 9/6/2019 | 9/6/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by jarrod nelson
|
BLD-Energy code compliance | 9/4/2019 | 9/4/2019 | 9/4/2019 | P | FAIL |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by jarrod nelson c/n fire blk fur down ceilling in walls// attic around stairs air barrior to min 14 inches// vappor barrior required 2nd floor heatted and coolled spaces.
|
BLD-Framing/Rough-in | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by jarrod nelson
|
BLD-Wall Bracing | 8/15/2019 | 8/15/2019 | 8/15/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by jarrod nelson
|
BLD-Footing | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|