Information based on query as of Wednesday, May 15, 2024.
Permit Information
Permit NumberBLD19-02279
StatusFinaled
Name IDACS LLC
Site Address 1290 W MYRTLE ST Unit: 310
Project NameBA Harris TI - Suite 310
Customer Number 
ePlanReviewYes
Description
(PIONEER CROSSING OFFICE BLDG – BA HARRIS LLC) (SUITE 310) Permit for the first time build-out of a 3,915 sq ft tenant space on the 3rd floor. Work to include: new interior non-bearing partition walls; doors; interior relites; electrical power and lighting; plumbing for break rooms; mechanical work including new mini-split unit on roof; and interior finishes in compliance with Ch. 8 of the 2015 IBC. Shell/Core constructed under BLD18-01166 and BLD18-01246. This building is Type IIB over Type IA podium per special provisions section of 2015 IBC 510.2. This building is fully fire sprinklered for height and area increase. Any alterations or modifications to the buildings Fire Sprinkler WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/21/201911/21/201911/21/2019PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Korey Hall
BLD-Final11/7/201911/7/201911/8/2019PPART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Korey Hall ok for teo ok to go perm co after elec gos perm
FIRE-Final Inspection11/7/201911/7/201911/7/2019PPASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by Korey Hall
FIRE-Final Inspection11/6/201911/6/201911/6/2019PFAIL
DetailsJim Page
FIR permit for fire alarms needs to be inspected and finaled before life fire safety inspection can be completed.

Phone #: ###-#### Inspection requested via web by Korey Hall
BLD-Ceiling Grid Inspection10/24/201910/25/201910/25/2019APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Korey Hall
BLD-Ceiling Grid Inspection10/23/201910/24/201910/24/2019AFAIL
DetailsJim Storey
CORY Phone #: ###-#### support min 8 inches each of mains// need info as to ele room to be fire protected.
BLD-Framing/Rough-in9/11/20199/13/20199/13/2019PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Korey Hall