Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberBLD19-02621
StatusTemporary Occupancy
Name PERRYMAN CONSTRUCTION MANAGEMENT IN
Site Address 7344 N LUCY ROSE LN
Project NameEaglehawk Fourplex - Bldg 5
Customer NumberBLD19-02617 TO BLD19-02622
ePlanReviewNo
Description
(EAGLEHAWK FOURPLEX MULTIFAMILY APARTMENTS – 7344 N. LUCY ROSE ST. – BUILDING 5) (6 BUILDING PERMITS UNDER BLD19-02617 IN EPLAN) //2-12-2020 PLAN MODIFICATION TO REPLACE MECHANICAL DESIGN WITH MANUAL S, J, ADJUSTMENTS TO MECHANICAL EQUIPMENT AND DUCTWORK. Jg.// Permit for the construction of a 4,852 sq. ft. 2-story four-unit apartment building. This building is one of six buildings within a multi-family development. Work to include general site work and the construction of the new building per the approved plans attached engineering and plan review report. Note: Special Inspections Required see form 310. This building is to be fully fire sprinklered with an NFPA 13-R system as required for residential occupancy. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/22/20206/23/20206/23/2020PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by bill gullickson/ ok pending zoning and others
BLD-Final6/17/20206/18/20206/23/2020PNR
DetailsTony Young
please call 30 minutes before inspection Phone #: ###-#### Inspection requested via web by bill gullickson
FIRE-Final Inspection6/17/20206/18/20206/18/2020PPASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed under kitchen sink in each unit with current inspection tags, knox box is installed by fire sprinkler riser room. Final life fire safety inspection is complete, signature card not available at time of inspection.

please call 30 minutes before inspection Phone #: ###-#### Inspection requested via web by bill gullickson
BLD-Energy code compliance4/3/20204/6/20204/6/2020APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by bill gullickson// ok after fixing a couple areas and fixing fire sprinkler tenting
BLD-Framing/Rough-in3/31/20204/1/20204/1/2020APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Ed Kron// see Bill for the fix list,, minor issues,, ok to insulate
BLD-Framing/Rough-in3/25/20203/26/20203/26/2020PDEFR
DetailsMike Jordan
please schedule for late afternoon. Thanks Phone #: ###-#### Inspection requested via web by bill gullickson. Due to employee on job site testing poitive for covid-19, inspection can not be performed at this time.
BLD-Framing/Rough-in3/23/20203/24/20203/24/2020PFAIL
DetailsMike Jordan
Please contact Bill 30 Minutes prior to arrival. Thanks Phone #: ###-#### Inspection requested via web by bill gullickson. Fire caulk all penetrations in 1hr. fire partitions, Install all missed fire blocking, install the dryer vent box per the listing in the 1hr. fire partition. Provide listing for ox boxes in 1hr. fire partition.
BLD-Wall Bracing2/14/20202/18/20202/18/2020APASS
DetailsTony Young
Ed Phone #: ###-####,, exterior ok after minor fixes
BLD-Conference1/8/20201/8/20201/8/2020PPART
DetailsTony Young
Pre-Framing Inspection conference. Please call Nic a half hour before arrival. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen// general and rim area fire seperation
BLD-Conference1/6/20201/7/20201/8/2020PDEFR
DetailsTony Young
Pre-Framing Inspection conference. Please call Nic a half hour before arrival. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen
BLD-Conference1/7/20201/8/20201/8/2020ADEFR
DetailsTony Young
Pre-Framing Inspection conference. Please call Nic a half hour before arrival. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen
BLD-Conference1/6/20201/7/20201/6/2020ACANC
DetailsTony Young
Pre-Framing Inspection conference. Please call Nic a half hour before inspection. Thanks, Phone #: ###-#### >> Inspection requested via web by Nic Van Diepen Inspection cancelled from web by: Nic Van Diepen
BLD-Concrete12/17/201912/17/201912/17/2019ADONE
DetailsTony Young
Interior slab on grade. Phone #: ###-#### Inspection requested via web by Nic Van Diepen
BLD-Energy code compliance11/22/201911/22/201911/25/2019PPASS
DetailsTony Young
Foundation rigid Insulation inspection. Thanks! Phone #: ###-#### Inspection requested via web by Nic Van Diepen
BLD-Foundation11/8/201911/12/201911/12/2019APASS
DetailsTony Young
Pat- foundation wall inspection Phone #: ###-####// footings ok
BLD-Footing11/8/201911/8/201911/8/2019PNR
DetailsTony Young
Pat Phone #: ###-####