BLD-Final | 2/10/2020 | 2/11/2020 | 2/11/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
DOC - Permit Finaled | 2/11/2020 | 2/11/2020 | 2/11/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 2/10/2020 | 2/11/2020 | 2/11/2020 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 3.97
|
BLD-Energy code compliance | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Framing/Rough-in | 11/25/2019 | 11/26/2019 | 11/26/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Framing/Rough-in | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Gus Brandon Inspection cancelled from web by: Gus Brandon
|
BLD-Wall Bracing | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | PART |
Brandon Shaw
|
|
|
All hold downs and floor to floor straps to as per plans before framing rough-in...
|
BLD-Foundation | 9/10/2019 | 9/11/2019 | 9/11/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Footing | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | CANC |
Brandon Shaw
|
|
|
deon Phone #: ###-####
|
BLD-Footing | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Gus Brandon Inspection cancelled from web by: Gus Brandon
|