BLD-Final | 5/27/2020 | 5/28/2020 | 5/28/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
DOC - Permit Finaled | 5/28/2020 | 5/28/2020 | 5/28/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 5/27/2020 | 5/28/2020 | 5/28/2020 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Final | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | NR |
Brandon Shaw
|
|
|
Guard rail on back order due to Covid-19...
|
BLD-Blower Door Test Results | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.6
|
BLD-Energy code compliance | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Framing/Rough-in | 2/17/2020 | 2/18/2020 | 2/18/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Framing/Rough-in | 2/11/2020 | 2/12/2020 | 2/12/2020 | P | FAIL |
Brandon Shaw
|
|
|
Hold downs to be as per plans... Point loads to bear down to foundation... Drag truss nailing to be as per plans... See plans for red marks and loactions...
|
BLD-Wall Bracing | 1/17/2020 | 1/17/2020 | 1/17/2020 | P | PART |
Brandon Shaw
|
|
|
Hold downs, floor to floor straps and hold down hardware to be as per plans before framing rough-in...
|
BLD-Foundation | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Foundation | 9/6/2019 | 9/6/2019 | 9/6/2019 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Gus Brandon Inspection cancelled from web by: Gus Brandon
|
BLD-Footing | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Gus Brandon Inspection cancelled from web by: Gus Brandon
|