Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD19-03145
StatusFinaled
Name HIGH DESERT BUILDING SERVICES LLC
Site Address 2226 N FRY ST
Project NameWolf Addition
Customer Number 
ePlanReviewNo
Description
Permit for a 440sq' addition that adds a Master Suite and a Dining Room. Wall from Kitchne to Living removed as part of this permit. All work per plans, notations, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/28/20205/28/20205/28/2020APASS
DetailsTell Riley
Dawne *screened* Phone #: ###-####//correction made, photos sent via email///
DOC - Permit Finaled5/28/20205/28/20205/28/2020PPASS
DetailsTell Riley
photos of new smoke/CO combo in interconnected postions sent via email//final complete//
BLD-Final5/26/20205/26/20205/28/2020PNR
DetailsTell Riley
Dawne *screened* Phone #: ###-####//need combo smoke/co detector in hallway//
BLD-Energy code compliance12/27/201912/27/201912/27/2019PPASS
DetailsTell Riley
Duane Phone #: ###-####//ok per provided REScheck evaluation for R38 in attic//
BLD-Wall cover12/26/201912/27/201912/27/2019ACANC
DetailsTell Riley
call for access // Duane Phone #: ###-####
DOC - Permit Finaled12/27/201912/27/201912/27/2019PCANC
DetailsTell Riley
(This activity was added in error so we have changed the case status back to Issued.)
BLD-Energy code compliance12/12/201912/13/201912/13/2019AFAIL
DetailsTell Riley
Duane- call prior for access info Phone #: ###-####//need R49 attic insulation///framing corrections made//
BLD-Framing/Rough-in12/6/201912/9/201912/9/2019APASS
DetailsTell Riley
call ahead for access // Dwayne Phone #: ###-####//add nails to girder per engineerign//add studs under window on north side of bedroom//ok to insulate only//
BLD-Wall Bracing11/15/201911/15/201911/15/2019PPASS
DetailsTell Riley
call ahead for access // Duane Phone #: ###-####
BLD-Footing11/14/201911/15/201911/15/2019PPASS
DetailsTell Riley
Call 30 mins // Dwayne Phone #: ###-####
BLD-Footing9/18/20199/19/20199/19/2019APASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Jay Jones//ok per plans//monopour wall and footing//