BLD-Final | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | PASS |
Brandon Shaw
|
|
|
*Screened* Les Phone #: ###-####
|
DOC - Permit Finaled | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.95
|
BLD-Energy code compliance | 4/14/2020 | 4/16/2020 | 4/16/2020 | A | CANC |
Brandon Shaw
|
|
|
Early as possible please. HVAC passed 4/14. Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Energy code compliance | 4/15/2020 | 4/15/2020 | 4/15/2020 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 4/13/2020 | 4/14/2020 | 4/15/2020 | P | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon//mechanical was not passed//left message with contact to possibly do virtual inspection, no response//
|
BLD-Framing/Rough-in | 4/8/2020 | 4/13/2020 | 4/13/2020 | A | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Gus Brandon Inspection cancelled from web by: Gus Brandon
|
BLD-Framing/Rough-in | 4/10/2020 | 4/10/2020 | 4/10/2020 | P | PEND |
Brandon Shaw
|
|
|
Pending mech rough-in...
|
BLD-Wall Bracing | 3/20/2020 | 3/23/2020 | 3/23/2020 | P | FAIL |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Wall Bracing | 3/19/2020 | 3/20/2020 | 3/20/2020 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon exterior nailling ok// hardware not complet.
|
BLD-Foundation | 10/3/2019 | 10/3/2019 | 10/3/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 10/2/2019 | 10/2/2019 | 10/2/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|