Information based on query as of Tuesday, May 14, 2024.
Permit Information
Permit NumberBLD19-03918
StatusIssued
Name OKLAND CONSTRUCTION CO INC
Site Address 749 E PARK BLVD
Project NamePark Place - Foundations
Customer NumberBLD19-01478
ePlanReviewYes
Description
**Green Tag Priority Review.** NO INSPECTIONS UNTIL PLAN MOD APPROVED** (FOOTING AND FOUNDATION PERMIT – PARK PLACE APARTMENTS AND GARAGE) (PROJECT MANAGEMENT – ANGIE BROSIOUS) (ESC19-00542) (10-30-19 PLAN MODIFICATION TO INSTALL 24” AND 30” DIAMETER AGGREGATE GEO PIERS BELOW CONCRETE FOOTINGS IN CONJUNCTION WITH THE FOOTING AND FOUNDATION WORK AS SHOWN ON THE APPROVED DRAWINGS. FOOTINGS ARE REQUIRED TO COLLECT THE LOAD AND TRANSFER IT TO THE GEO PIERS WHICH ARE INTENDED TO LIMIT BUILDING SETTLEMENT WITHOUT OVERSTRESSING THE FOOTINGS. SPECIAL INSPECTION IS REQUIRED.) To construct the footings and foundations for a new 6 level garage building to be constructed under permit BLD19-01478 and to construct the footings and foundations for a new 5 story apartment building to be constructed under permit BLD19-01479. Special Inspection is required for soils and for concrete. Work is to include reinforced concrete footings and reinforced concrete foundations. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. Work beyond the footings and foundations is NOT allowed under this permit. This permit does not establish a Certificate of Occupancy for any portion of any building. CJW
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Concrete2/6/20202/10/20202/10/2020PCANC
DetailsDave Hannah
LVL 2 slab on deck pour - area "B" Phone #: ###-#### Inspection requested via web by Garrett Camp ok after spec inspection sign offs
BLD-Concrete2/7/20202/10/20202/10/2020APEND
DetailsDave Hannah
Columns to be poured @ South half of pour "A". Phone #: ###-#### Inspection requested via web by Garrett Camp ok after spec inspection sign offs
BLD-Footing2/7/20202/10/20202/10/2020APEND
DetailsDave Hannah
Apartment footings @ SW quadrant. Phone #: ###-#### Inspection requested via web by Garrett Camp ok after spec inspection sign offs
BLD-Concrete2/6/20202/7/20202/10/2020APEND
DetailsDave Hannah
Column pour @ lvl 2 deck - area "A" - and shear wall @ lvl 2 deck, West shear wall. Phone #: ###-#### Inspection requested via web by Garrett Camp ok after spec inspection sign offs
BLD-Concrete1/30/20201/30/20202/3/2020PDONE
DetailsDave Hannah
Inspection of slab on deck pour with PT Phone #: ###-#### Inspection requested via web by Garrett Camp
BLD-Concrete1/8/20201/8/20201/13/2020PPASS
DetailsDave Hannah
Slab on grade reinforcement
Thanks Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Concrete1/3/20201/3/20201/6/2020PPEND
DetailsDave Hannah
SOG - ramp to mini ramp. Grids P4 - P9 Phone #: ###-#### Inspection requested via web by Garrett Camp
BLD-Concrete12/31/20191/2/20201/2/2020APASS
DetailsDave Hannah
Need inspection on shear wall from PC - PD along P1. Columns at grid intersections PD.8/P1; PE/P1; and PB.6/P1. Foot between P3.2 - P4 along PA. Phone #: ###-#### Inspection requested via web by Garrett Camp
BLD-Concrete12/30/201912/31/201912/31/2019APASS
DetailsDave Hannah
Columns @ NW and SW corners of level 1. Total of 10. Phone #: ###-#### Inspection requested via web by Garrett Camp
BLD-Foundation12/23/201912/23/201912/24/2019PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Foundation12/19/201912/20/201912/23/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Foundation12/11/201912/11/201912/11/2019PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Foundation12/6/201912/6/201912/6/2019PPART
DetailsBrandon Shaw
Pending Special Inspection...
BLD-Foundation12/3/201912/3/201912/3/2019PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Footing11/25/201911/25/201911/26/2019PPASS
DetailsDave Hannah
Footings, Foundation. Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Footing11/21/201911/21/201911/22/2019PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Footing11/4/201911/5/201911/5/2019ADONE
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Jim Williams