BLD-Final | 6/17/2020 | 6/18/2020 | 6/18/2020 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Ken Litzinger// prior c/n made ok
|
DOC - Permit Finaled | 6/18/2020 | 6/18/2020 | 6/18/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 6/11/2020 | 6/12/2020 | 6/12/2020 | P | PEND |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ken Litzinger needs tempered glass at bottom of stairs and blower door test ok to move in
|
BLD-Energy code compliance | 3/3/2020 | 3/4/2020 | 3/4/2020 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Ken Litzinger
|
BLD-Framing/Rough-in | 3/2/2020 | 3/3/2020 | 3/3/2020 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Ken Litzinger
|
BLD-Framing/Rough-in | 2/28/2020 | 3/2/2020 | 3/2/2020 | A | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Ken Litzinger// c/n posted,, ok to insulate if needed
|
BLD-Framing/Rough-in | 2/26/2020 | 2/27/2020 | 2/27/2020 | A | NR |
Brandon Shaw
|
|
|
Need Mec rough-in...
|
BLD-Framing/Rough-in | 2/26/2020 | 2/27/2020 | 2/26/2020 | P | CANC |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ken Litzinger Inspection cancelled from web by: Ken Litzinger
|
BLD-Wall Bracing | 1/30/2020 | 1/31/2020 | 1/31/2020 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ken Litzinger
|
BLD-Wall Bracing | 1/29/2020 | 1/29/2020 | 1/29/2020 | P | FAIL |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ken Litzinger missing hold downs by front door used stapes not nails need engineers letter needs to nail seal plate
|
BLD-Footing | 11/7/2019 | 11/7/2019 | 11/7/2019 | P | PART |
Mike Jordan
|
|
|
Noted that column pad fotting dimensions did not transpose to approved city plans. Contractor has made column pad footings 3ft.x3ft. and will add (3)#4 rebar each way.
|
BLD-Footing | 11/7/2019 | 11/7/2019 | 11/7/2019 | P | FAIL |
Mike Jordan
|
|
|
Francis Phone #: ###-####. Footing plans are incomplete. No schedule or dimensions for column pad fottings. Needs to resubmit.
|