Permit NumberBLD19-04427
StatusIssued
Name TBL CONSTRUCTION
Site Address 1906 N 12TH ST
Project Name 
Customer NumberDEMO BLD19-02361
ePlanReviewNo
Description
Permit for the construction of a new 3505 sq. ft., three story (first story 1428 sq. ft., second story 647 sq. ft. basement 1428 sq. ft.) single family dwelling with 5 bedrooms, 4.5 bathrooms, approximately 229 sq. ft. of covered patio/porch and a 576 sq. ft. detached garage with 2nd story unfinished storage area, not permitted for ADU; per the approved plans and any notations. Prescriptive Energy Compliance. R-1CH zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Wall cover8/10/20208/11/20208/11/2020APASS
DetailsTony Young
Garage insulation inspection only

Thank u sir Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
BLD-Wall cover5/21/20205/22/20205/22/2020APEND
DetailsTony Young
Tim; Phone #: ###-####// ok pending fireplace
BLD-Energy code compliance5/20/20205/21/20205/21/2020APART
DetailsTony Young
Tim will be on site. This is new construction. House approval only. thank you Phone #: ###-#### Inspection requested via web by Timothy Beaudoin// ok pending fireplace pass
BLD-Framing/Rough-in5/19/20205/19/20205/19/2020PPART
DetailsTony Young
Tim is on site. Engineer has walked through and approved. Email has been sent to Tony. Phone #: ###-#### Inspection requested via web by Timothy Beaudoin// ok to insulate,, needs fireplace pass prior to cover
BLD-Wall Bracing4/6/20204/7/20204/7/2020APASS
DetailsDave Hannah
Site is unoccupied and vacant. There will be no sub contractors there tomorrow. The sheer has been done on both the house and garage. The plans are on the table inside the house and are open to the appropriate sheer pages. Call Tim if any issues.

Thanks Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
BLD-Foundation1/30/20201/31/20201/31/2020APASS
DetailsDave Hannah
Will be done and ready today (Thursday) Inspection time does not matter on this. We will be pouring Monday. Thank you. Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
BLD-Footing1/28/20201/29/20201/30/2020PPASS
DetailsDave Hannah
Eric will be on site. Call if any problems. Thank u Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
BLD-Foundation1/22/20201/23/20201/23/2020APART
DetailsTony Young
Call tim if any issues

Eric is on site .... Phone #: ###-#### Inspection requested via web by Timothy Beaudoin// basement walls,, work in progress,, ok
BLD-Footing1/16/20201/17/20201/17/2020APART
DetailsTell Riley
Ken Phone #: ###-####/basement exterior footers ONLY//rebar ok per plans//setbacks appear to be ok after conversation with Tony//check setbacks to confim at wall inpection//blankets onsite//