BLD-Final | 8/3/2020 | 8/3/2020 | 8/3/2020 | P | NR |
Tony Young
|
|
|
Kaylee */ In Occupied Residence, Virtual Inspection requested*/ Phone #: ###-####// need trades and zoning 1st
|
BLD-Energy code compliance | 7/13/2020 | 7/13/2020 | 7/13/2020 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### x541 Inspection requested via web by Kailee Poetsch/// wanted a frame inspection// ok to insulate.. verify seal pack and mech. pass on vent
|
BLD-Conference | 4/1/2020 | 4/1/2020 | 4/1/2020 | P | PART |
Tony Young
|
|
|
Sheathing and framing inspection. Phone #: ###-#### Inspection requested via web by Kailee Poetsch,, ok to cover the exterior
|
BLD-Framing/Rough-in | 3/30/2020 | 3/30/2020 | 3/30/2020 | P | NR |
Jim Storey
|
|
|
Kerry (didn''t leave phone number) Phone #: ###-####
|
BLD-Wall Bracing | 3/30/2020 | 3/30/2020 | 3/30/2020 | P | PASS |
Jim Storey
|
|
|
Kerry (didn''t leave phone number) Phone #: ###-####
|
BLD-Conference | 12/3/2019 | 12/4/2019 | 12/4/2019 | P | PART |
Tony Young
|
|
|
Kaylee Phone #: ###-####,, frame ?s,, fix existing as needed
|
BLD-Foundation | 11/22/2019 | 11/25/2019 | 11/25/2019 | A | PASS |
Tony Young
|
|
|
Kalie Phone #: ###-####
|
BLD-Foundation | 11/21/2019 | 11/22/2019 | 11/22/2019 | A | PASS |
Tony Young
|
|
|
Kalie Phone #: ###-####
|