BLD-Final | 2/11/2020 | 2/12/2020 | 2/12/2020 | A | PASS |
Mike Jordan
|
|
|
Larry Phone #: ###-####. All issues have been resolved. Ok for perm occ.
|
BLD-Final | 2/10/2020 | 2/11/2020 | 2/11/2020 | A | FAIL |
Mike Jordan
|
|
|
Larry Phone #: ###-####. Noted that indoor freezer is 1700 square ft. and requires a 2nd. exit. Rermove shelving from indoor portion and obstructions from exterior areas at 2nd. exit. this 2nd exit shall be maintained and kept free of obstructions.
|
FIRE-Final Inspection | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Larry Phone #: ###-####
|
BLD-Final | 1/22/2020 | 1/23/2020 | 1/23/2020 | P | NR |
Dave Hannah
|
|
|
David Phone #: ###-#### needs fire life saftey final first
|
FIRE-Final Inspection | 1/22/2020 | 1/23/2020 | 1/23/2020 | A | FAIL |
Troy Cobbley
|
|
|
Revised floor plan needed. All other life safety items appear ok.
David Phone #: ###-####
|