BLD-Framing/Rough-in | 7/13/2020 | 7/14/2020 | 7/14/2020 | A | PEND |
Mike Jordan
|
|
|
screened - bolt // Shane Phone #: ###-####. Bolts are in snug tight condition, all plys are in conact. 3rd part inspection required to complete turn of the nut method per plans.
|
BLD-Foundation | 7/6/2020 | 7/7/2020 | 7/7/2020 | P | PART |
Mike Jordan
|
|
|
Shane SCREENED Phone #: ###-####. Work in progress on slab on grade and perimeter curb. Ok to place concrete pending special inspection.
|
BLD-Footing | 6/25/2020 | 6/26/2020 | 6/26/2020 | P | DEFR |
Mike Jordan
|
|
|
Shane - Pour time at noon Phone #: ###-####. Ok to place concrete pending special inspection.
|
BLD-Footing | 6/24/2020 | 6/24/2020 | 6/24/2020 | P | PASS |
Mike Jordan
|
|
|
Shane Phone #: ###-####. Column pad footings on gridline A, against existing building.
|
BLD-Footing | 6/18/2020 | 6/19/2020 | 6/19/2020 | P | DEFR |
Mike Jordan
|
|
|
Shane Pour time at 1 Phone #: ###-####. Ok pending special inspection.
|
BLD-Footing | 6/4/2020 | 6/5/2020 | 6/5/2020 | A | CANC |
Mike Jordan
|
|
|
Shane Phone #: ###-####
**CANCEL PER SHANE**
|