BLD-Other | 7/14/2020 | 7/15/2020 | 7/15/2020 | A | CANC |
Tell Riley
|
|
|
Underground gas inspection on gas line between meter and future pool equipment location Phone #: ###-#### Inspection requested via web by Monica McNair//this isnpection needs to be completed under a Mechanical permit for the gas line//
|
BLD-Footing | 7/8/2020 | 7/9/2020 | 7/9/2020 | A | PASS |
Mike Jordan
|
|
|
** Please speak with Mike Jordan about steel inspection that took place on 7/8/2020** ** Mike Jordan advised us that we are ok to proceed with scheduled shotcrete date of 7/9/2020 as long as we request an AM inspection and we wait to cover deep end and deep end cove to allow for exposure for an AM inspection while shotcrete proceeds as planed **
Rebar inspection on steel in pool in the back yard. Phone #: ###-#### Inspection requested via web by Monica McNair. Issues have been resolved.
|
BLD-Footing | 7/7/2020 | 7/8/2020 | 7/8/2020 | P | FAIL |
Mike Jordan
|
|
|
Rebar inspection on steel in back yard. Plans and permits are on site near the future equipment location. If you have any questions please feel free to call Monica at (208) 405.8849 Phone #: ###-#### Inspection requested via web by Monica McNair. Provide minimum 3 inch clearance for reinforcement at deep end of pool.
|