Final | 4/3/2015 | 4/6/2015 | 4/6/2015 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Debby Pierce Final ok
|
Final | 4/1/2015 | 4/3/2015 | 4/3/2015 | A | FAIL |
Rock A. Hudson
|
|
|
Greg Milburn is contact at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce 2 receptacle outlets located in shop area still require GFCI protection as per 210.8
|
Final | 3/31/2015 | 3/31/2015 | 3/31/2015 | A | FAIL |
Bob Reichert
|
|
|
Bill Peace is contact. ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce called, left correction notice, NEC shall label disconnects, add show room receptacles, add covers to switches, bath fan shall operate, provide gfci protection for shop receptacles, support conduits, raceways, secure loose box
|
Electrical Rough-In | 3/3/2015 | 3/4/2015 | 3/4/2015 | A | PASS |
Bob Reichert
|
|
|
Greg Milburn is contact at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce called, ri ok, office side
|
Conference | 3/2/2015 | 3/2/2015 | 3/2/2015 | P | PASS |
Cevyn Recla
|
|
|
Please call Bill Peace first at ###-####, for meet up... thank you... Phone #: ###-#### Inspection requested via web by Debby Pierce Discussion about TI and wiring requirements. Existing building, wood frame with romex turing commercial. Allowed to keep origigional wires in place, and remove uninspected romex and all new wiring to be commercial grade.
|