Final | 6/8/2015 | 6/9/2015 | 6/9/2015 | P | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Shawna Gates final ok
|
Conference | 5/14/2015 | 5/14/2015 | 5/14/2015 | A | DONE |
Daryl DeGrange
|
|
|
Please call Mike for phone conference or we can meet onsite. Mikes number is ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates Discussed requirement for ceiling grill inspection
|
Electrical Rough-In | 4/20/2015 | 4/20/2015 | 4/20/2015 | P | PASS |
Daryl DeGrange
|
|
|
Wall inspection. Shane is the contact his cell no. is ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates rough-in ok cover breakroom walls
|
Electrical Rough-In | 4/16/2015 | 4/16/2015 | 4/16/2015 | P | PASS |
Daryl DeGrange
|
|
|
Wall- Shannon is the contact his cell no. is ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates rough-in ok cover walls except break room
|