Final | 9/15/2015 | 9/16/2015 | 9/16/2015 | A | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Jarod Murray corrections made final ok
|
Final | 9/15/2015 | 9/15/2015 | 9/15/2015 | P | FAIL |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Jarod Murray 314.27 (b) floor boxes listed specifically for this application shall be used for receptacles located in the floor 314.20 boxes recessed more then 1/4" shall have a listed extension ring installed
|
Electrical Rough-In | 4/29/2015 | 4/29/2015 | 4/29/2015 | P | PASS |
Daryl DeGrange
|
|
|
jarod Phone #: ###-#### Additional floor receptacle at slider door required for final, rough-in ok cover master bedroom,bathroom addition
|