Final | 2/28/2019 | 2/28/2019 | 2/28/2019 | P | PASS |
Daryl DeGrange
|
|
|
Final ok
|
Final | 2/8/2019 | 2/11/2019 | 2/11/2019 | A | PASS |
Mark Moncarr
|
|
|
Dave JES electric ###-#### Ok final to close out permit. 2nd electrical was pulled by Szurgot Elec. ELE18-01733 to finish work being done.
|
Conference | 2/8/2019 | 2/8/2019 | 2/8/2019 | P | CANC |
Mark Moncarr
|
|
|
This Job Was Cancelled And The Prooerty Sold Need To Cancel Out This Permit Have Been Un Able To Find The Builder Or Owner Investment Group Phone #: ###-#### Inspection requested via web by jason shifflett Re-scheduled to 2/11/19
|
Electrical Rough-In | 2/14/2017 | 2/14/2017 | 2/14/2017 | P | PASS |
Mark Moncarr
|
|
|
We Rough In Some Cans In A Zero Clearance Roof We Will Be Supplementing This Permit For A total Rewire Of This House Once We Have All The Information. They Need To Insulate And Cover The Roof Due To Weather Wires Are Ran And Stubbed Down To Tentative Switch Locations.Thanks Dave ###-#### Phone #: ###-#### Inspection requested via web by jason shifflett Ok cover 5 shallow cutin cans in main living space
|