Final | 4/23/2018 | 4/23/2018 | 4/23/2018 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Dennis Ahern Final ok
|
Electrical Rough-In | 12/28/2017 | 12/28/2017 | 12/28/2017 | P | PASS |
Rock A. Hudson
|
|
|
Please call before to insure I''m on location. Thanks! Phone #: ###-#### Inspection requested via web by Dennis Ahern Discussed shall identify ground and neutral of 100 amp feed from house, if receptacles used for garage lights receptacles shall be located directly above luminaire, all wiring shall be protected by guard strips when attic access is installed, attic fan shall be hard wired. Garage rough in ok cover
|
Conference | 9/12/2017 | 9/13/2017 | 9/13/2017 | P | DONE |
Rock A. Hudson
|
|
|
I have 1 1/2" conduit laid from my shop site up to the service panel location on my house. I believe you want to see that conduit before I cover it. Phone #: ###-#### Inspection requested via web by Dennis Ahern Discussed Idaho Power requirement of 16' for overhead service entrance conductor clearence over residential driveways. Also owner ok to do service change on house, connect feed to garage and do corrections associated with house when remodelling house. Panel in garage to installed in bathroom wall facing interior of shop not in bathroom.
|
Electrical Rough-In | 9/13/2017 | 9/13/2017 | 9/13/2017 | P | PASS |
Rock A. Hudson
|
|
|
I have 1 1/2" conduit laid from my shop site up to the service panel location on my house. I believe you want to see that conduit before I cover it. Phone #: ###-#### Inspection requested via web by Dennis Ahern Underground from house to new garage and to shed rough in ok cover
|
Conference | 7/31/2017 | 8/1/2017 | 8/1/2017 | A | DONE |
Rock A. Hudson
|
|
|
Dennis Phone #: ###-####-please call when on way Discussed mostly scope of work covered by permit ELE17-02434 for service change. Mast, overhead clearence, conduit fill, and types of meter panel combos available today. Under house needs attention securing and making sure all wiring has proper fusing. Discussed underground depth and type of conduit, sch 80 where emerging from grade, Tamper resistant type and GFCI requirements and minimum circuits required for garage. Plans are to have 60 amps to garage and 4 to 6 circuits in garage.
|
Conference | 7/28/2017 | 7/31/2017 | 7/28/2017 | A | CANC |
Rock A. Hudson
|
|
|
I''d like to have a consultation before beginning work on my 18x24 garage/shop Phone #: ###-#### >> Inspection requested via web by Dennis Ahern-cancelled until we hear from the customer about fees-left message on his phone
|