Final | 7/16/2018 | 7/17/2018 | 7/17/2018 | P | PASS |
James Ady
|
|
|
If you can call me with 20-30 minutes notice I can meet you there.Thanks Phone #: ###-#### Inspection requested via web by Craig Korell final ok
|
Electrical Rough-In | 6/6/2018 | 6/7/2018 | 6/7/2018 | P | PASS |
Rock A. Hudson
|
|
|
Trench in back is ready. Please call Stan when you arrive.Stan-###-#### Phone #: ###-#### Inspection requested via web by Craig Korell Underground rough in ok cover
|
Electrical Rough-In | 6/6/2018 | 6/6/2018 | 6/6/2018 | P | NH |
Rock A. Hudson
|
|
|
This Inspection will be for the underground leading into the building from the pool. Thank you. Phone #: ###-#### Inspection requested via web by Craig Korell All gates locked contact unable to reach responcible party for access. Will recall
|
Electrical Rough-In | 5/13/2018 | 5/14/2018 | 5/14/2018 | A | PASS |
Rock A. Hudson
|
|
|
Equipotential bonding grid ready for inspection. Access is around right side of condos. Stan is manager-###-#### Phone #: ###-#### Inspection requested via web by Craig Korell Perimeter and luminaire shell bond rough in ok cover
|
Electrical Rough-In | 3/14/2018 | 3/15/2018 | 3/15/2018 | A | PASS |
Rock A. Hudson
|
|
|
This inspection is for the equipotential bonding plane. The gate on the right side of the apartment complex will be unlocked. If it is not here is the phone number to the manager Stan. ###-####. Phone #: ###-#### Inspection requested via web by Craig Korell Will be future inspection for luminaires and existing pool shell where rebar has been exposed and run back to equipment with underground conduits. Inspection for top 6" extension pour rebar on 4 corners stubs only rough in ok cover
|
Conference | 3/9/2018 | 3/14/2018 | 3/14/2018 | A | DONE |
Rock A. Hudson
|
|
|
I will be on site by 8:30 am. Feel free to call me when you are on your way and I will meet you at the front door. Phone #: ###-#### Inspection requested via web by Craig Korell Discussed the requirements for pool remodel. Pool shell bonding will be bonded to exposed rebar and then rebar will be encased in new concrete pour. 6" of concrete to be added to top of pool shell with seperate bond needed due to this rebar not connected to existing. Equipotential perimeter bond and new LED luminaires to be installed in existing luminaire shells. Bonding and potting inspections required for lighting. All pool equipment to be GFCI protected.
|