Final | 5/11/2018 | 5/11/2018 | 5/11/2018 | P | PASS |
Rock A. Hudson
|
|
|
Late as possible please. Phone #: ###-#### Inspection requested via web by Brad Girard Final ok
|
Final | 5/10/2018 | 5/10/2018 | 5/10/2018 | P | NR |
James Ady
|
|
|
As late as possible for inspection please. Phone #: ###-#### Inspection requested via web by Brad Girard Not quite ready
|
Electrical Rough-In | 4/23/2018 | 4/23/2018 | 4/23/2018 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Brad Girard All rest of walls rough in ok cover
|
Electrical Rough-In | 4/17/2018 | 4/17/2018 | 4/17/2018 | P | PART |
Rock A. Hudson
|
|
|
Lock box 2468# Phone #: ###-#### Inspection requested via web by Brad Girard Attached to BLD18-00986 and changed suite number to 110. Except Conference and bathrooms, wall rough in ok cover
|
Electrical Rough-In | 4/13/2018 | 4/13/2018 | 4/13/2018 | A | FAIL |
Rock A. Hudson
|
|
|
Need partial wall cover. Lock box code 2468# Phone #: ###-#### Inspection requested via web by Brad Girard Building permit is under review, unable to inspect until BLD is issued. Recall when ready.
|